International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : IMT : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�IMT� C�

ITU-R�IMT

Results:32 total items.
Contributions��Documents / Contributions

Number
Title Source Date
[ 32 ]
(Rev.1)
Liaison statement to relevant exernal organizations on the schedule for updating Recommendation ITU-R M.1457 to revision 4 � Project Manager, IMT-2000 2008-06-24
[ 31 ]
Note to 3GPP and 3GPP2 from ITU-R WP 8F - Coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area � Project Manager, IMT-2000 2008-06-24
[ 30 ]
Liaison statement to external organizations regarding updating of ITU-R Quesitons, Recommendations, Reports, Resolutions and Handbooks assigned to WP 8A-WG 6 regarding cellular (pre-IMT-2000) systems, including evolution/migration to IMT-2000 � Project Manager, IMT-2000 2008-06-24
[ 29 ]
Coordinated introduction of IMT-2000 in the Americas � Project Manager, IMT-2000 2008-06-24
[ 28 ]
Coordinated introduction of IMT-2000 in the Asia-Pacific Region � Project Manager, IMT-2000 2008-06-24
[ 27 ]
Progress Report on international mobile equipment identity for IMT-2000 systems � Project Manager, IMT-2000 2008-06-24
[ 26 ]
ITU-D Seminar on IMT-2000 (Abidjan, 9-12 September 2002) � Project Manager, IMT-2000 2008-06-24
[ 25 ]
Results of WTDC-02 related to IMT-2000 � Project Manager, IMT-2000 2008-06-24
[ 24 ]
Report on international activities on emergency telecommunications � Project Manager, IMT-2000 2008-06-24
[ 23 ]
Liaison statement to relevant external organizations on the schedule for updating Recommendation ITU-R M.1457 to revision 3 � Project Manager, IMT-2000 2008-06-24
[ 22 ]
Report of the 2nd meeting of the of the APT IMT-200 Forum (APTIF-2) � Director, Radiocommunication Bureau 2008-06-24
[ 21 ]
Progress Report on the ITU IMT-2000 Project - General � Project Manager, IMT-2000 2008-06-24
[ 20 ]
Progress Report on the ITU IMT-2000 Project - Handbook on IMT-2000 deployment � Project Manager, IMT-2000 2008-06-24
[ 19 ]
Notes from the meeting between Mr. Maurice Ghazal (General Coordinator and Rappoorteur of ITU-R Q.5/SSG) and Mr. Fabio Leite (Technical Secretary and ITU-R Project Manager, IMT-2000), Geneva, 14.12.01 - Handbook on IMT-2000 deployment � Project Manager, IMT-2000 2008-06-24
[ 18 ]
Report on the activities of the IMT-2000 Project for 2001 � Project Manager, IMT-2000 2008-06-24
[ 17 ]
Report on the ITU Region 2 consultation meeting on global circulation of IMT-2000 terminals � Project Manager, IMT-2000 2008-06-24
[ 16 ]
Progress Report on the ITU IMT-2000 Project - Handbook on IMT-2000 deployment � Project Manager, IMT-2000 2008-06-24
[ 15 ]
Progress Report on ITU IMT-2000 activities � Project Manager, IMT-2000 2008-06-24
[ 14 ]
Liaison statement to standard development organizations on the completion of the revision of Recommendation ITU-R M.1457 � Project Manager, IMT-2000 2008-06-24
[ 13 ]
Progress Report on the ITU IMT-2000 Project - Handbook on IMT-2000 deployment � Progress Manager, IMT-2000 2008-06-24
[ 12 ]
Progress Report on the ITU IMT-2000 Project - Global circulation � Project Manager, IMT-2000 2008-06-24
[ 11 ]
Progress Report on the ITU IMT-2000 Project - Developing IMT-2000 � Project Manager, IMT-2000 2008-06-24
[ 10 ]
Progress Report on the ITU IMT-2000 Project � Project Manager, IMT-2000 2008-06-24
[ 9 ]
Draft response to ITU-T SG 13 liaison statement on the ITU-T IP project � Project Manager, IMT-2000 2008-06-24
[ 8 ]
IMT-2000 systems and beyond and IPV6 � Project Manager, IMT-2000 2008-06-24
[ 7 ]
Mobile equipment identification in IMT-2000 networks � Project Manager, IMT-2000 2008-06-24
[ 6 ]
Report on the workshop on assessing the requirements for deploying key 3G services � Project Manager, IMT-2000 2008-06-24
[ 5 ]
Mobile location-based services and emergency communications in IMT-2000 � Project Manager, IMT-2000 2008-06-24
[ 4 ]
Liaison statement to external organizations and other interested parties - Vocabulary of terms for IMT-2000 � Project Manager, IMT-2000 2008-06-24
[ 3 ]
(Rev.1)
Liaison statement to external organizations - List of comments on the rceived input contributions containing material for revision 1 of Recommendation ITU-R M.1457 � Project Manager, IMT-2000 2008-06-24
[ 2 ]
(Rev.1)
Requirement to provide assurance for the global core specification as relates to recommedation ITU-R M.1457 � Project Manager, IMT-2000 2008-06-24
[ 1 ]
(Rev.2)
Update procedure for revisions of Recommendation ITU-R M.1457 (Detailed specifications of the radio interfaces of IMT 2000) � Project Manager, IMT-2000 2008-06-23
Results:32 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2008-06-23