Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 76 ]
�
� |
Liaison statement to Working Parties 6E, 7A, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9C - Interference protection requirements from power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 1A
� |
� |
2007-06-19 |
|
[ 75 ]
�
+Ann.1-5� |
Chairman's Report - Meeting 10-14 May 2007
�
� |
Chairman, WP 9A
� |
� |
2007-05-15 |
|
[ 74 ]
�
� |
Final List of Participants - Working Party 9A (Geneva, 10-14 May 2007)
�
� |
Director, BR
� |
� |
2007-05-14 |
|
[ 73 ]
�
� |
This document has been withdrawn
�
� |
BR Study Group Department
� |
� |
2007-05-14 |
|
[ 72 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2007-05-09 |
|
[ 71 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.1669 - Interference criteria of fixed wireless systems operating in the 37-40 GHz and 40.5-42.5 GHz bands with respect to satellites in the geostationary orbit
�
� |
United States of America
� |
127/9
� |
2007-05-01 |
|
[ 70 ]
�
� |
Proposed draft revision of Recommendation ITU-R F.1094-1 - Maximum allowable error performance and availability degradations to digital radio-relay systems arising from interference from emissions and radiations from other sources
�
� |
United States of America
� |
127/9
� |
2007-05-01 |
|
[ 69 ]
�
� |
Draft revision of Recommendation ITU-R F.1094-1 - Maximum allowable error performance and availability degradations to digital radio-relay systems arising from interference from emissions and radiations from other sources
�
� |
Russian Federation
� |
127/9
� |
2007-04-27 |
|
[ 68 ]
�
� |
Draft revision of Recommendation ITU-R F.592 - Vocabulary of terms for the fixed service
�
� |
Japan
� |
� |
2007-04-25 |
|
[ 67 ]
�
� |
Considerations on Questions assigned to Working Parties 9A and 9B
�
� |
Japan
� |
� |
2007-04-25 |
|
[ 66 ]
�
� |
Review of the old Recommendations within Working Party 9A
�
� |
Japan
� |
� |
2007-04-25 |
|
[ 65 ]
�
� |
Development of a draft new Report on analytical lists of the F-series and SF-series Recommendations
�
� |
Japan
� |
� |
2007-04-25 |
|
[ 64 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
�
� |
Coordination Committee for Vocabulary (CCV)
� |
� |
2007-01-11 |
|
[ 63 ]
�
� |
LS to WP 9A - Invitation to consider the future status of Question ITU-R 122/9
�
� |
WP's 3J, 3K and 3M
� |
� |
2006-11-08 |
|
[ 62 ]
�
� |
On application of the ITU-R Recommendation F.1495 and proposals for its modification -
Interference criteria to protect the fixed service from time varying aggregate interference from other services sharing the 17.7-19.3 GHz band on a co-primary basis
�
� |
Russian Federation
� |
127/9
� |
2006-07-06 |
|
[ 61 ]
�
+Corr.1� |
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
�
� |
WP 3M
� |
� |
2006-10-06 |
|
[ 60 ]
�
+Ann.1-11� |
Chairman's report, Kobe meeting 28 June - 4 July 2006
�
� |
Chairman, WP 9A
� |
� |
2006-07-10 |
|
[ 59 ]
�
� |
Final list of participants
�
� |
Director, BR
� |
� |
2006-07-10 |
|
[ 58 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.1094-1 - Maximum allowable error performance and availability degradations to digital radio-relay systems arising from interference from emissions and radiation from other sources
�
� |
Korea (Republic of)
� |
� |
2006-06-20 |
|
[ 57 ]
�
� |
Review of old Recommendations within Working Party 9A
�
� |
Japan
� |
� |
2006-06-16 |
|
[ 56 ]
�
� |
Proposal for Preliminary Draft Revision of Recommendation ITU-R F.592-3 - Vocabulary of terms for the fixed service
�
� |
Japan
� |
� |
2006-06-16 |
|
[ 55 ]
�
� |
Consideration of Questions assigned to WP 9A and future work
�
� |
Canada
� |
� |
2006-06-16 |
|
[ 54 ]
�
� |
Liaison statement to WP 9A - Future revision of Recommendation ITU-R F.1566
�
� |
ITU-T SG 4
� |
� |
2006-06-12 |
|
[ 53 ]
�
� |
Requested course of action when revising existing Recommendations, developing new Recommendations or new Reports
�
� |
SG 9 Rapporteur on Vocabulary
� |
� |
2006-06-08 |
|
[ 52 ]
�
+Ann.1-7� |
Chairman's report - 23-30 November meeting
�
� |
Chairman, WP 9A
� |
� |
2005-12-05 |
|
[ 51 ]
�
� |
Final List of Participants - Working Party 9A
�
� |
Director, BR
� |
� |
2005-11-29 |
|
[ 50 ]
�
� |
Liaison statement to Working Party 9A - Working document towards WRC-07 Agenda item 1.18 - Analysis of the FS protection criteria contained in limits on the interference to the FS stations recommended by Recommendation ITU-R F.1495
�
� |
WP 4-9S
� |
� |
2005-11-22 |
|
[ 49 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2005-11-22 |
|
[ 48 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.1566 - Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy - based international paths and sections
�
� |
Russian Federation
� |
161/9
� |
2005-11-15 |
|
[ 47 ]
�
� |
Protection criteria and their apportionment terminology and clarifications needed
�
� |
Siemens S.p.A.
� |
� |
2005-11-15 |
|
[ 46 ]
�
� |
Liaison statement to Working Party 9A concerning impact of Recommendation ITU-R P.530-11 On FS link design for small fade depths
�
� |
WP 3M
� |
� |
2005-10-10 |
|
[ 45 ]
�
� |
Liaison statement to WP 8A - Impact of Recommendation ITU-R P.837 on FS link design using rain attenuation calculations in Recommendation ITU-R P.530
�
� |
WPs 3J and 3M
� |
� |
2005-10-10 |
|
[ 44 ]
�
+Ann.1-5� |
Report on the meeting of Working Party 9A - 21-27 April 2005
�
� |
Chairman, WP 9A
� |
� |
2005-05-02 |
|
[ 43 ]
�
� |
Final list of participants
�
� |
Director, BR
� |
� |
2005-05-02 |
|
[ 42 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2005-04-25 |
|
[ 41 ]
�
� |
Applicability of the FS protection criteria in Recommendation ITU-R F.1495 for studies with respect to HEO satellites in the 18 GHz band
�
� |
Finland
� |
� |
2005-04-21 |
|
[ 40 ]
�
(Rev.1)� |
Preparation of the second phase of the World Summit on the Information Society (WSIS) in relation to broadband wireless access
�
� |
Director, BR
� |
� |
2005-04-14 |
|
[ 39 ]
�
� |
Impact of Recommendation ITU-R P.530-10 on FS link design for small fade depths
�
� |
Germany (Federal Republic of)
� |
122/9
� |
2005-04-12 |
|
[ 38 ]
�
� |
Disaster-relief radiocommunications
�
� |
Director, BR
� |
� |
2005-04-12 |
|
[ 37 ]
�
� |
Proposed revision of Recommendation ITU-R F.1668 - Error performance objectives for real digital fixed wireless links used in 27 500 km hypothetical reference paths and connections
�
� |
Brazil (Federative Republic of)
� |
210/9
� |
2005-04-05 |
|
[ 36 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.752 - Diversity techniques for fixed wireless systems
�
� |
Australia
� |
122/9
� |
2005-04-01 |
|
[ 35 ]
�
� |
Results of WTSA, RAG and CVC relevant to the work of the Working Parties of Study Group 9
�
� |
Director, Radiocommunication Bureau
� |
� |
2005-03-31 |
|
[ 34 ]
�
� |
Liaison statement to ITU-R WP 9A - Future revision of Recommendation ITU-R F.1330
�
� |
ITU-T SG 4
� |
� |
2005-03-09 |
|
[ 33 ]
�
� |
Liaison statement to WP 9A - Impact of Recommendation ITU-R P.837-4 on FS links design using rain attenuation calculations in Recommendation ITU-R P.530-10
�
� |
WP's 3J & 3M
� |
� |
2004-11-16 |
|
[ 32 ]
�
� |
Liaison statement to WP 9A - Outage time predictions using signature parameters in Recommendation ITU-R P.530
�
� |
WP 3M
� |
� |
2004-11-09 |
|
[ 31 ]
�
� |
Liaison statement to Working Party 9A - Request for guidance on prediction method for outage intensity (OI)
�
� |
WP 3M
� |
� |
2004-10-26 |
|
[ 30 ]
�
� |
Liaison statement to Working Parties 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9A and 9D - PDNR ITU-R SM.[EML] - Index for evaluation of the effect of interference between radio communication networks operating in a shared frequency band
�
� |
WP 1B
� |
� |
2004-10-21 |
|
[ 29 ]
�
� |
Liaison statement to Working Party 3 M for action and Working Party 9A for information
�
� |
WP 4-9S
� |
� |
2004-10-11 |
|
[ 28 ]
�
+Ann.1-7� |
Report on the meeting of Working Party 9A, Geneva, 21-28 September 2004
�
� |
Chairman, WP 9A
� |
� |
2004-10-01 |
|
[ 27 ]
�
� |
Final List of Participants - Working Party 9A
�
� |
Director, BR
� |
� |
2004-09-27 |
Results:76 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):