Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 156 ]
�
� |
Liaison statement to Working Parties 6B and 9D - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service for use in sharing studies
�
� |
WP 8A
� |
� |
2007-08-01 |
|
[ 155 ]
�
� |
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B
�
� |
WP 4-9S
� |
� |
2007-06-29 |
|
[ 154 ]
�
� |
Liaison statement to Working Parties 6E, 7A, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9C - Interference protection requirements from power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 1A
� |
� |
2007-06-19 |
|
[ 153 ]
�
� |
Response to the liaison statement of Working Party 3J (copy to WPs 4A, 6E, 6M, 6S, 7B, 7C, 7D 8A, 8B, 8D, 8F and 9B) - Radio noise
�
� |
WP 1A
� |
� |
2007-06-18 |
|
[ 152 ]
�
� |
Liaison statement to WP 1B - Study of Software Defined Radio and cognitive radio systems in WP 1B
�
� |
WP 4A
� |
� |
2007-06-08 |
|
[ 151 ]
�
� |
Liaison statement to ITU-R Working Party 7D
�
� |
ITU-T SG 5
� |
� |
2007-05-30 |
|
[ 150 ]
�
� |
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B
�
� |
WP 9B and 9D
� |
� |
2007-05-21 |
|
[ 149 ]
�
� |
Reply to Liaison statement from 1B on the study of software defined radio and cognitive radio systems
�
� |
WP 6S
� |
� |
2007-05-08 |
|
[ 148 ]
�
� |
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B - (Copy for information to ITU-R WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 9B and 9D)
�
� |
WP 8F
� |
� |
2007-02-16 |
|
[ 147 ]
�
+Ann.1-3� |
Report on the February 2007 Meeting of Working Party 7D
�
� |
Chairman, WP 7D
� |
� |
2007-02-09 |
|
[ 146 ]
�
� |
Final List of Participants - Working Party 7D (Geneva, 6-9 February 2007)
�
� |
Director, BR
� |
� |
2007-02-09 |
|
[ 145 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2007-02-05 |
|
[ 144 ]
�
� |
Astronomical use of the frequency band 100 - 300 THz and coexistence with other applications
�
� |
Canada
� |
235/7
� |
2007-01-26 |
|
[ 143 ]
�
� |
Review of the Questions assigned to WP 7D
�
� |
Vice-Chairman, SG 7
� |
� |
2007-01-23 |
|
[ 142 ]
�
� |
Working document towards Preliminary Draft Report - Techniques for migration of radio frequency interference in radio astronomy
�
� |
United States of America
� |
237/7
� |
2007-01-22 |
|
[ 141 ]
�
� |
Preliminary draft new Recommendation ITU-R F. [HAPS- RAS 47GHz] - Protection of RAS in 48.94-49.04 GHz band from Out-of-Band emissions from HAPS in 47.2-47.5 GHz and 47.9-48.2 GHz bands
�
� |
Australia
� |
� |
2007-01-15 |
|
[ 140 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
�
� |
Coordination Committee for Vocabulary (CCV)
� |
� |
2007-01-11 |
|
[ 139 ]
�
� |
Liaison statement to WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9B and 9D - The study of software defined radio and cognitive radio systems in Working Party 1B
�
� |
WP 1B
� |
� |
2006-11-09 |
|
[ 138 ]
�
� |
Liaison statement to Working Parties 6J and 9D copy to 4B, 6E, 7C, 7D, 8B, 8F, 9B, and ITU-T Study Group 9 - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service
�
� |
WP 8A
� |
� |
2006-11-03 |
|
[ 137 ]
�
� |
Recommendation to be brought to the attention of Working Party 7D
�
� |
BR, Study Group Department
� |
� |
2006-10-30 |
|
[ 136 ]
�
+Corr.1� |
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
�
� |
WP 3M
� |
� |
2006-10-06 |
|
[ 135 ]
�
� |
Liaison statement to WP 7D
�
� |
ITU-T SG 5
� |
� |
2006-09-27 |
|
[ 134 ]
�
+Ann.1-3� |
Chairman's report - meeting 28-31 August 2006
�
� |
Chairman, WP 7D
� |
� |
2006-09-04 |
|
[ 133 ]
�
� |
Final List of Participants
�
� |
Director, BR
� |
� |
2006-08-30 |
|
[ 132 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2006-08-25 |
|
[ 131 ]
�
� |
Preliminary Draft New Report - The impact on the radio astronomy service of unwanted emissions in excess of the levels defined by Recommendation ITU-R RA.769
�
� |
IUCAF
� |
145/7
� |
2006-08-18 |
|
[ 130 ]
�
� |
Proposed revision to draft text for the CPM report on WRC-07 Agenda Item 1.7
�
� |
Russian Federation
� |
� |
2006-08-18 |
|
[ 129 ]
�
� |
Calculation of interference to spaceborne receivers of the Space Research Service (passive) from mobile Earth station (E-s) in the frequency band 1 668-1 668.4 MHz
�
� |
Russian Federation
� |
� |
2006-08-18 |
|
[ 128 ]
�
� |
Sharing study for High Altitude Platform Stations in 47.2-47.5 GHz and 47.9-48.2 GHz bands to protect Radio Astronomy Services in 48.94-49.04 GHz band
�
� |
Australia
� |
146/7
� |
2006-08-11 |
|
[ 127 ]
�
� |
Misprint in ITU-R RA Handbook-2nd Edition
�
� |
Korea (Republic of)
� |
� |
2006-08-18 |
|
[ 126 ]
�
� |
A preliminary Draft Revision of Recommendation ITU-R RA.1031
�
� |
Korea (Republic of)
� |
145/7
� |
2006-08-18 |
|
[ 125 ]
�
� |
Interim report of the current results of computer simulations in relation to WRC-07 Agenda item 1.7
�
� |
Coord of Corresp Grp of WRC-07 Agenda Item 1.7
� |
� |
2006-08-16 |
|
[ 124 ]
�
� |
Information document on sharing between the radio astronomy service and the fixed service in the bands 71-76 GHz, 81-86 GHz and 92-95 GHz
�
� |
United States of America
� |
226/7
� |
2006-08-10 |
|
[ 123 ]
�
� |
Working document towards PDN Report - Radio observations of pulsars for precision timekeeping
�
� |
United States of America
� |
205/7
� |
2006-08-10 |
|
[ 122 ]
�
� |
Liaison statement to WP's 6J, 4B, 6E, 7C, 7D, 8A, 8B, 8D, 8F, 9B, JTG 6-8-9 and ITU-T SG9 - System characteristics for use in sharing studies with television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the fixed service
�
� |
WP 9D
� |
� |
2006-07-19 |
|
[ 121 ]
�
� |
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336
�
� |
WP 9D
� |
� |
2006-07-19 |
|
[ 120 ]
�
� |
ITU-R study Group 8 Question to be brought to the attention of Working Parties 4A, 7D, 9B, 9C and 9D
�
� |
BR Study Group Department
� |
� |
2006-05-11 |
|
[ 119 ]
�
� |
ITU-R Study Group 6 Question to be brought to the attention of Working Parties 4A, 7B, 7C, 7D, 8D and 9D
�
� |
BR Study Group Department
� |
� |
2006-05-01 |
|
[ 118 ]
�
� |
Liaison statement to Working Parties 7B, 7C, 7D and 8D - Additional information regarding sharing studies in bands between 16 and 30 GHz for aeronautical mobile telemetry applications
�
� |
WP 8B
� |
� |
2006-04-28 |
|
[ 117 ]
�
� |
Liaison statement to Working Party 7D - Compatibility studies between aeronautical mobile telemetry systems and the radio astronomy service in the 4 825-4 835 MHz band
�
� |
WP 8B
� |
� |
2006-04-28 |
|
[ 116 ]
�
(Rev.1)� |
Liaison statement - Result of the study under Recommendation 723 (WRC-03)
�
� |
WP 8A
� |
� |
2006-04-21 |
|
[ 115 ]
�
� |
LS to WP's 7D and 8D - Revision of Recommendation ITU-R S.1586
�
� |
WP 4A
� |
� |
2006-04-19 |
|
[ 114 ]
�
� |
Liaison statement to Working Party 7D - Sharing between the MSS and SRS (passive) services in the band 1 668-1 668.4 MHz
�
� |
WP 8D (SWG 8D3)
� |
� |
2006-03-20 |
|
[ 113 ]
�
� |
Liaison statement to WP 7D - CPM text sections related to compatibility between non-GSO MSS feeder links in frequencies near 1 400 MHz and the radio astronomy service in the band 1 400-1 427 MHz
�
� |
WP 8D
� |
� |
2006-03-17 |
|
[ 112 ]
�
� |
Liaison statement to WPs 4B, 6E, 7C, 7D, 8A, 8D, 8F, 9B, 9D, JTG 6-8-9 and ITU-T SG 9 - Spectrum usage and operational characteristics of terrestrial electronic news gathering systems (ENG), television outside broadcast (TVOB) and electronic field production (EFP)
�
� |
WP 6J
� |
� |
2006-03-16 |
|
[ 111 ]
�
� |
Liaison statement to WP 7D (Copy to WP 4A for information) - Proposed corrections on Recommendations ITU-R S.1586 and ITU-R M.1583
�
� |
WP 8D
� |
236/4
� |
2006-03-14 |
|
[ 110 ]
�
� |
ABU Views on WRC-07 Agenda item 1.21
�
� |
Asia-Pacific Broadcasting Union (ABU)
� |
� |
2006-02-28 |
|
[ 109 ]
�
� |
Liaison statement to 4A, 4B, 4-9S, 6S, 7B, 7C, 7D - NGN and satellite work; and intersector coordination group on satellite (ICG-SAT) matters
�
� |
ITU-T Study Group 13
� |
10/13, ITU-T
� |
2006-02-07 |
|
[ 108 ]
�
� |
Liaison statement from WP 1B to SG 7
�
� |
WP 1B
� |
� |
2006-02-03 |
|
[ 107 ]
�
� |
Liaison statement to WPs 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to TG 1/9 and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336
�
� |
WP 9D
� |
� |
2005-12-21 |
Results:156 total items. Result page:�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):