Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 54 ]
�
+Ann.1-3� |
Chairman's report - Meeting 11-14 September 2007
�
� |
Chairman, WP 7A
� |
� |
2007-09-14 |
|
[ 53 ]
�
� |
Final List of Participants - Working Party 7A
Geneva, 11-14 September 2007
�
� |
Director, BR
� |
� |
2007-09-14 |
|
[ 52 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2007-09-05 |
|
[ 51 ]
�
� |
Note on Coordinated Universal Time UTC
�
� |
BIPM
� |
� |
2007-09-04 |
|
[ 50 ]
�
� |
Information document - Interference between standard frequency and time signal services operating between 20 and 90 kHz
�
� |
Japan
� |
102/7
� |
2007-09-03 |
|
[ 49 ]
�
� |
Information document - Questionnaire on "Possible future change to Coordinated Universal Time (UTC)" in Japan
�
� |
Japan
� |
236/7
� |
2007-09-03 |
|
[ 48 ]
�
� |
Proposed Preliminary draft new ITU-R Recommendation - Internal time scales for communication and navigation systems
�
� |
United States of America
� |
� |
2007-08-30 |
|
[ 47 ]
�
� |
Proposals for revision of Recommendation ITU-R TF.460-6
�
� |
Italy
� |
236/7
� |
2007-08-30 |
|
[ 46 ]
�
� |
Liaison statement to Working Parties 6E, 7A, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9C - Interference protection requirements from power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 1A
� |
� |
2007-06-19 |
|
[ 45 ]
�
(Rev.1)� |
Proposed Draft New Question - Application and improvement of two-way satellite time and frequency transfer (TWSTFT)
�
� |
Germany (Federal Republic of)
� |
� |
2007-05-08 |
|
[ 44 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
�
� |
Coordination Committee for Vocabulary (CCV)
� |
� |
2007-01-11 |
|
[ 43 ]
�
+Ann.1-4� |
Chairman's report - meeting 29 August - 1 September 2006
�
� |
Chairman, WP 7A
� |
� |
2006-09-04 |
|
[ 42 ]
�
� |
Final List of Participants
�
� |
Director, BR
� |
� |
2006-08-31 |
|
[ 41 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2006-08-28 |
|
[ 40 ]
�
� |
Interference between standard frequency and time signal services operating between 20 and 90 kHz
�
� |
Japan
� |
102/7
� |
2006-08-18 |
|
[ 39 ]
�
� |
Information document - Report on the last leap second adjustment in Japan
�
� |
Japan
� |
236/7
� |
2006-08-18 |
|
[ 38 ]
�
� |
Contribution to the discussion on the future of the UTC time scale
�
� |
United States of America
� |
236/7
� |
2006-08-17 |
|
[ 37 ]
�
� |
Proposed modification of Recommendation ITU-R TF.583 - Information document, regarding IRIG codes
�
� |
Germany (Federal Republic of)
� |
239/7
� |
2006-08-09 |
|
[ 36 ]
�
� |
Proposed modification of revised Recommendation ITU-R TF.460-6 - Standard-frequency and time signal emissions
�
� |
Germany (Federal Republic of)
� |
102/7
� |
2006-08-09 |
|
[ 35 ]
�
� |
Contribution to the discussion on the future of the UTC time scale
�
� |
Russian Federation
� |
236/7
� |
2006-08-07 |
|
[ 34 ]
�
� |
Liaison statement from WP 1B to SG 7
�
� |
WP 1B
� |
� |
2006-02-03 |
|
[ 33 ]
�
+Ann.1-5� |
Chairman's report - meeting 8-11 November 2005
�
� |
Chairman, WP 7A
� |
� |
2005-11-15 |
|
[ 32 ]
�
� |
Final List of Participants - Working Party 7A
�
� |
Director, BR
� |
� |
2005-11-10 |
|
[ 31 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2005-11-07 |
|
[ 30 ]
�
� |
Proposed draft new Question - Interference to standard frequency and time-signal services caused by noise from electrical appliances
�
� |
Japan
� |
� |
2005-10-28 |
|
[ 29 ]
�
� |
PDNR - Interference between standard frequency and time signal services operating at low frequencies
�
� |
Japan
� |
� |
2005-10-28 |
|
[ 28 ]
�
� |
Contribution to the discussion on the future of the UTC time scale - Question ITU-R 236/7 and Recommendation ITU-R TF.460-6
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
236/7
� |
2005-10-27 |
|
[ 27 ]
�
� |
Contribution to the draft revised Recommendation ITU-R TF.460-6
�
� |
Italy
� |
236/7
� |
2005-10-21 |
|
[ 26 ]
�
� |
Proposed modification of revised Recommendation ITU-R TF.460-6
�
� |
France
� |
102/7
� |
2005-10-18 |
|
[ 25 ]
�
� |
Information document on interference between standard frequency and time signal services operating between 20 and 90 kHz
�
� |
United States of America
� |
102/7
� |
2005-10-18 |
|
[ 24 ]
�
� |
Liaison statement to Working Party 7A - Necessary bandwidth of standard frequency and time signals
�
� |
WP 1A
� |
� |
2005-10-04 |
|
[ 23 ]
�
� |
Contribution to the discussion on the future of the UTC time scale - Question ITU-R 236/7 and Recommendation ITU-R TF.460
�
� |
Germany (Federal Republic of)
� |
236/7
� |
2005-09-21 |
|
[ 22 ]
�
� |
Liaison statement to WPs 3L, 6E, 7A, 7D, 8A, 8B and 9C - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 1A
� |
� |
2004-10-20 |
|
[ 21 ]
�
+Ann.1-5� |
Report on the meeting of Working Party 7A, Geneva, 28 September to 1 October 2004
�
� |
Chairman, WP 7A
� |
� |
2004-10-01 |
|
[ 20 ]
�
� |
Final List of Participants - Working Party 7A
�
� |
Director, BR
� |
� |
2004-09-30 |
|
[ 19 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2004-09-27 |
|
[ 18 ]
�
� |
Progress Report towards the meeting of Working Party 7A
�
� |
Chairman, WP 7A
� |
� |
2004-09-27 |
|
[ 17 ]
�
� |
Working document to the preliminary draft new Recommendation "Time scale based on pulsar timing"
�
� |
Russian Federation
� |
205/7
� |
2004-09-20 |
|
[ 16 ]
�
� |
Proposed new Question ITU-R XXX - Interference between standard frequency and time signal services operating at low frequency
�
� |
United States of America
� |
� |
2004-09-01 |
|
[ 15 ]
�
� |
Proposed revised Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions
�
� |
United States of America
� |
� |
2004-09-01 |
|
[ 14 ]
�
� |
Liaison statement to WPs 7A, 8A, 8B and 9C - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distributing wiring
�
� |
WP 1A
� |
221/1
� |
2003-11-06 |
|
[ 13 ]
�
(Rev.1)� |
Liaison statement to Working Party 7A - Draft revision of Recommendation ITU-R SM.1541 - Annex 7
�
� |
WP 1A
� |
� |
2003-11-05 |
|
[ 12 ]
�
� |
Review of ITU-R Recommendations by Study Group 7
�
� |
Vice-Chairman, SG 7
� |
� |
2003-10-09 |
|
[ 11 ]
�
� |
Report of the meeting of Working Party 7A
�
� |
Chairman, WP 7A
� |
� |
2003-10-08 |
|
[ 10 ]
�
� |
Final List of Participants - Working Party 7A
�
� |
Director, BR
� |
� |
2003-10-07 |
|
[ 9 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2003-10-03 |
|
[ 8 ]
�
� |
WRC-07 Agenda Items and allocation of preparatory work by the CPM06-1 to responsible, contributing and interested groups involving Study Group 7
�
� |
BR Study Group Department
� |
� |
2003-10-03 |
|
[ 7 ]
�
� |
Progress Report towards the meeting of Working Party 7A
�
� |
Chairman, WP 7A
� |
� |
2003-10-03 |
|
[ 6 ]
�
� |
Working document to the preliminary draft new Recommendation - Time scale based on pulsar timing
�
� |
Russian Federation
� |
205/7
� |
2003-10-01 |
|
[ 5 ]
�
� |
Information document for Liaison statement to WP 1A - Survey results on specification of equipments using band 5 of SFTS
�
� |
Japan
� |
222/1
� |
2003-09-29 |
Results:54 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):