Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 432 ]
�
� |
Liaison statement to Working Party 4A (copied to Working Parties 8F, 9B, 9D and 4-9S) - Compatibility between broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks
�
� |
WP 8A
� |
� |
2007-08-01 |
|
[ 431 ]
�
� |
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B
�
� |
WP 4-9S
� |
� |
2007-06-29 |
|
[ 430 ]
�
� |
Response to the liaison statement of Working Party 3J (copy to WPs 4A, 6E, 6M, 6S, 7B, 7C, 7D 8A, 8B, 8D, 8F and 9B) - Radio noise
�
� |
WP 1A
� |
� |
2007-06-18 |
|
[ 429 ]
�
+Ann.1-11� |
Report on the meeting of Working Party 4A (Geneva, 4-8 June 2007)
�
� |
Chairman, WP 4A
� |
� |
2007-06-08 |
|
[ 428 ]
�
� |
Final List of Participants - Working Party 4A (Geneva, 4-8 June 2007)
�
� |
Director, BR
� |
� |
2007-06-08 |
|
[ 427 ]
�
� |
Liaison statement to Working Party 4A - Frequency-related matters for IMT-2000 and IMT-Advanced related to WRC-07 agenda item 1.4
�
� |
WP 8F
� |
� |
2007-06-04 |
|
[ 426 ]
�
� |
Report of the 21st and 22nd meetings of ITU-R Working Party 8F
�
� |
WP 4A Rapporteur to WP 8F
� |
� |
2007-06-01 |
|
[ 425 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2007-05-31 |
|
[ 424 ]
�
� |
Historical analysis of the occupancy of the geostationary orbit, GEO Part II
�
� |
Colombia (Republic of)
� |
� |
2007-05-28 |
|
[ 423 ]
�
� |
Historical analysis of the occupancy of the geostationary orbit, GEO
�
� |
Colombia (Republic of)
� |
� |
2007-05-28 |
|
[ 422 ]
�
� |
Comments on the preliminary draft revision to Recommendation ITU-R S.465-5
�
� |
Korea (Republic of)
� |
� |
2007-05-28 |
|
[ 421 ]
�
� |
Impact on FSS reception in the 4 000 MHz range by transmissions of wireless access networks not covered by WRC-07 Agenda item 1.4
�
� |
Asia Satellite Telecommunications Co. Ltd (AsiaSat
� |
� |
2007-05-28 |
|
[ 420 ]
�
� |
Update of technical parameters of Annex 1 of Appendix 30B
�
� |
Asia Satellite Telecommunications Co. Ltd (AsiaSat
� |
� |
2007-05-28 |
|
[ 419 ]
�
� |
Preliminary draft revision to Recommendation ITU-R S.465-5
�
� |
Canada
� |
� |
2007-05-28 |
|
[ 418 ]
�
� |
Proposed draft new Report - Compatibility of broadband wireless access networks and fixed-satellite service networks in the 3 400-4 200 MHz band
�
� |
SES New Skies B.V.
� |
� |
2007-05-27 |
|
[ 417 ]
�
� |
Document on the non-sequential approach (Approach 2) under Agenda item 1.10
�
� |
Canada
� |
� |
2007-05-28 |
|
[ 416 ]
�
� |
Review of the allotments technical parameters
�
� |
France
� |
� |
2007-05-25 |
|
[ 415 ]
�
� |
Comments on the preliminary draft revision to Recommendation ITU-R S.465-5 "Reference earth-station radiation pattern for use in coordination and interference assessment in the frequency range from 2 to about 30 GHz"
�
� |
United States of America
� |
� |
2007-05-25 |
|
[ 414 ]
�
� |
Possible new protection criteria in Appendix 30B
�
� |
France
� |
� |
2007-05-25 |
|
[ 413 ]
�
� |
Elements for a liaison statement to WP 7B - Guidelines for efficient use of the geostationary orbit by fixed satellite and meteorological satellite systems operating around 18 GHz in the space-to-Earth direction
�
� |
United States of America
� |
� |
2007-05-25 |
|
[ 412 ]
�
� |
FSS sharing with aeronautical mobile service applications - Draft liaison statement to WP 8B
�
� |
United States of America
� |
� |
2007-05-25 |
|
[ 411 ]
�
� |
Earth station antenna pattern
�
� |
Luxembourg
� |
� |
2007-05-25 |
|
[ 410 ]
�
� |
Comments/proposal to the preliminary draft revision to Recommendation ITU-R S.465-5 - Reference earth-station radiation pattern for use in coordination and interference assessment in the frequency range from 2 to 31 GHz
�
� |
Japan
� |
� |
2007-05-25 |
|
[ 409 ]
�
� |
Considerations on possible review of the main technical parameters in the FSS Plan
�
� |
Russian Federation
� |
� |
2007-05-24 |
|
[ 408 ]
�
� |
On the allocation of the frequency band 3 400-4 200 MHz for operation of IMT-2000 systems
�
� |
Russian Federation
� |
� |
2007-05-24 |
|
[ 407 ]
�
� |
Possible calculation of reference situation by the Bureau during the conference in response to changes to technical parameters and criteria in Appendix 30B
�
� |
Director, BR
� |
� |
2007-05-25 |
|
[ 406 ]
�
� |
Calculation of mutual interference among assignments in the list which are derived from Part B of the Plan ("existing system") in Appendix 30B
�
� |
Director, BR
� |
� |
2007-05-25 |
|
[ 405 ]
�
� |
Document on WRC-07 Agenda item 1.10 (for information only) - Approach 3, hybrid of sequential and non sequential approaches
�
� |
Iran (Islamic Republic of)
� |
� |
2007-05-21 |
|
[ 404 ]
�
� |
Liaison statement to Working Party 4A - NGN/satellite Workshop and meeting of the ICG-SAT
�
� |
ITU-T Study Group 13
� |
� |
2007-05-21 |
|
[ 403 ]
�
� |
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B
�
� |
WP 9B and 9D
� |
� |
2007-05-21 |
|
[ 402 ]
�
� |
Impact of IMT transmissions in the 4 GHz range on FSS reception without frequency overlap
�
� |
Asia Satellite Telecommunications Co. Ltd
� |
� |
2007-05-16 |
|
[ 401 ]
�
� |
Reply to Liaison statement from 1B on the study of software defined radio and cognitive radio systems
�
� |
WP 6S
� |
� |
2007-05-08 |
|
[ 400 ]
�
� |
ITU-R Study Group 8 Question to be brought to the attention of Working Parties 4A, 7B, 7C and 9D
�
� |
BR Study Group Department
� |
� |
2007-04-18 |
|
[ 399 ]
�
� |
Recommendation to be brought to the attention of Working Parties 4A, 6S, 7B, 8D and 4-9S
�
� |
BR Study Group Department
� |
� |
2007-03-14 |
|
[ 398 ]
�
� |
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B - (Copy for information to ITU-R WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 9B and 9D)
�
� |
WP 8F
� |
� |
2007-02-16 |
|
[ 397 ]
�
� |
Liaison statement to Working Party 4A and Working Party 4B for information - Impact of Recommendation ITU-R S.1432 on the use of the band 18.1-18.3 GHz
�
� |
WP 7B
� |
� |
2007-02-16 |
|
[ 396 ]
�
� |
Draft liaison statement to Working Party 4A - PDNR on frequency sharing between Space VLBI and Lunar systems of the SRS and FSS systems in the 37.5-38 GHz band
�
� |
WP 7B
� |
211/7
� |
2007-02-16 |
|
[ 395 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
�
� |
Coordination Committee for Vocabulary (CCV)
� |
� |
2007-01-11 |
|
[ 394 ]
�
� |
Liaison statement to WP 4A - Coordination distances for cases involving ground-based earth stations and aircraft terrestrial stations
�
� |
WP 8B
� |
� |
2006-11-24 |
|
[ 393 ]
�
� |
Liaison statement to WP 4A - FSS OoB domain limit defined in Annex 5 of Recommendation ITU-R SM.1541
�
� |
WP 1A
� |
� |
2006-11-14 |
|
[ 392 ]
�
� |
Liaison statement to WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9B and 9D - The study of software defined radio and cognitive radio systems in Working Party 1B
�
� |
WP 1B
� |
� |
2006-11-09 |
|
[ 391 ]
�
� |
Liaison statement to Working Party 7C - For information to Working Parties 4A, 6J and 9D - Results of the studies relating to Agenda item 1.2 and draft CPM Report text
�
� |
WP 8A
� |
� |
2006-11-06 |
|
[ 390 ]
�
� |
Recommendation to be brought to the attention of Working Parties 1A, 4A, 6S and 8D
�
� |
BR Study Group Department
� |
� |
2006-10-30 |
|
[ 389 ]
�
+Ann.1-19� |
Chairman's report - Meeting 4 - 13 September 2006
�
� |
Chairman, WP 4A
� |
� |
2006-10-06 |
|
[ 388 ]
�
+Corr.1� |
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
�
� |
WP 3M
� |
� |
2006-10-06 |
|
[ 387 ]
�
� |
Recommendation to be brought to the attention of Working Party 4A
�
� |
BR Study Group Department
� |
� |
2006-09-25 |
|
[ 386 ]
�
� |
Recommendation to be brought to the attention of Working Parties 4A, 6E, 7C, 8A and 8F
�
� |
BR, Study Group Department
� |
� |
2006-09-25 |
|
[ 385 ]
�
� |
Final List of Participants - Working Party 4A (Geneva, 4-13 September 2006)
�
� |
Director, BR
� |
� |
2006-09-12 |
|
[ 384 ]
�
� |
Liaison statement concerning the proposed preliminary draft new Reports ITU-R SA.[SVLBI FSS 38 GHz] and SA.[LUNAR FSS 38 GHz] for frequency sharing between SRS and FSS systems in the 37.5-38 GHz band
�
� |
WP 7B
� |
211/7, 202/7
� |
2006-09-05 |
|
[ 383 ]
�
� |
Liaison statement on the development of a DNR ITU-R S.[WIDEBAND] "Characteristics of fixed-satellite service systems using wideband spreading signals"
�
� |
WP 4B
� |
270/4
� |
2006-09-04 |
Results:432 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):