International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : TG1/9 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�TG1/9� C�

ITU-R�TG1/9

Compatibility between passive and active services

Results:189 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source Date
[ 189 ]
+Ann.1-2
Chairman's report - Meeting 11-15 September 2006 � Chairman, TG 1/9 2006-09-18
[ 188 ]
Final List of Participants, Task Group 1/9 (Geneva, 11-15 September 2006) � Director, BR 2006-09-14
[ 187 ]
Liaison statement to Task Group 1/9 and Working Party 1A - Mathematical inconsistency when linking the FSS OoB domain mask of Annex 5 of Recommendation ITU-R SM.1541 and the FSS spurious emission limit of RR Appendix 3 � WP 4A 2006-09-11
[ 186 ] �
List of documents issued � BR Study Group Department 2006-09-08
[ 185 ] �
Preliminary draft revisions of Annex 3 of Recommendation ITU-R SM.1633 - Compatibility analysis between the EESS (passive) systems operating in the 1 400-1 427 MHz band and radiolocation service systems operating in the 1 350-1 400 MHz band � France 2006-09-04
[ 184 ] �
Proposed revisions of Annex 13 of Recommendation ITU-R SM.1633 - Compatibility analysis between the Earth exploration-satellite service (passive) in the 23.6-24 GHz band and the ISS in the 22.55-23.55 GHz band � France 2006-09-04
[ 183 ] �
Proposed modifications to the draft CPM text for WRC-07 Agenda Item 1.21 (Chapter 2 of the CPM Report) � France , Switzerland (Confederation of) 2006-09-04
[ 182 ]
Proposed revisions of Annex 20 of Recommendation ITU-R SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and the FSS (Earth-to-space) service systems operating in the 50.4-51.4 GHz band � France 2006-09-04
[ 181 ]
Proposed revisions to Annex 19 of Recommendation SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and FSS (Earth-to-space) systems operating in the 47.2-50.2 GHz band � France 2006-09-04
[ 180 ]
Proposed revisions to Annex 14 of Recommendation ITU-R SM.1633 - Compatibility analysis between the EESS (passive) in the 31.3-31.5 GHz band and the FSS (Earth-to-space) and the MSS (Earth-to-space) in the 30-31 GHz band � France 2006-09-04
[ 179 ]
Proposed revision of Annex 2 to TG 1/9 Chairman's Report - Preliminary draft replacement of the technical appendix to Annex 1 towards the preliminary revision of Recommendation ITU-R SM.1633 ("Methodology") � France 2006-09-04
[ 178 ]
Draft CPM text for WRC-07 Agenda Item 1.20 � WMO 2006-09-04
[ 177 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Draft new Report ITU-R SM.[RAS] - Studies related to the impact of active services allocated in adjacent or nearby bands on RAS passive service � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 176 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Draft new Report ITU-R SM.[EESS] - Studies related to the impact of active services allocated in adjacent or nearby bands on EESS passive service � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 175 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Working document on option "A" towards a preliminary draft new Recommendation ITU-R SM.[BAND-BY-BAND] - Compatibility anaylsis between a passive service and an active service allocated in adjacent and nearby bands � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 174 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Working document on option "C" towards a preliminary draft new Recommendation ITU-R SM.[BAND-BY-BAND] - Compatibility analysis between a passive service and an active service allocated in adjacent and nearby bands � Coordinator of TG1/9 Correspondence Group 2006-09-04
[ 173 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Working Document on option "C" towards a preliminary draft new Recommendation ITU-R SM.[METHODOLOGY] - Methodology to be used in conducting compatibility analysis between a passive service and an active service allocated in adjacent and nearby bands � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 172 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Working document (Part II) on option "E" towards a preliminary draft new Recommendation ITU-R SM.[BAND-BY-BAND] - Compatibility analysis between a passive service and an active service allocated in adjacent and nearby bands � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 171 ]
CG on options for updating the contents of Recommendation ITU-R SM. 1633 - Working document (Part I) on option "E" towards a preliminary draft revision of the Recommendation ITU-R SM. 1633 - Compatibility analysis between a passive service and an active service allocated in adjacent and nearby bands � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 170 ]
CG on options for updating the contents of Recommendation ITU-R SM.1633 - Working document on option "B" towards a draft revision of Recommendation ITU-R SM.1633 - Compatibility analysis between a passive service and an active service allocated in adjacent and nearby bands � Coordinator of TG 1/9 Correspondence Group 2006-09-04
[ 169 ]
Proposed modification to preliminary draft new Annex [MS-EESS-1.4GHz] of Recommendation ITU-R SM.1633 � Japan 2006-09-04
[ 168 ]
Proposed modification to the draft CPM text for WRC-07 Agenda Item 1.20 � Japan 2006-09-04
[ 167 ]
Proposed revisions to working document: Compatibility analysis between the EESS (passive) systems operating in the 1 400-1 427 MHz band and radiolocation service systems operating in the 1 350-1 400 MHz band � United States of America 2006-09-03
[ 166 ]
Compatibility analysis between EESS (passive) systems operating in the 30.3-30.5 GHz band and the FSS (Earth-to-space) service systems operating in the 30-31 GHz band � United States of America 2006-09-03
[ 165 ]
Proposed revision to Recommendation ITU-R SM.1633 � United States of America 2006-09-03
[ 164 ]
Compatibility analysis between the Earth exploration-satellite (passive) service systems operating in the 1 400-1 427 MHz band and the fixed service in the bands 1 350-1 400 MHz and 1 427-1 452 MHz band � United States of America 2006-09-03
[ 163 ]
Compatibility analysis between the Earth exploration-satellite (passive) service systems operating in the 1 400-1 427 MHz band and the mobile service in the bands 1 350-1 400 MHz and 1 427-1 452 MHz � United States of America 2006-09-03
[ 162 ]
Compatibility analysis between the Earth exploration satellite (passive) service systems operating in the 1 400-1 427 MHz band and space operation (Earth-to-space) service systems operating in the 1 427-1 429 MHz band � United States of America 2006-09-03
[ 161 ]
Compatibility analysis between the Earth exploration-satellite service (passive) in the 23.6-24 GHz band and the ISS in the 22.55-23.55 GHz band � United States of America 2006-09-03
[ 160 ]
Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and FSS (Earth-to-space) systems operating in the 47.2-50.2 GHz band � United States of America 2006-09-03
[ 159 ]
Compatibility analysis between EESS (passive) systems operating in the 50.4-51.4 GHz band and FSS (Earth-to-space) systems operating in the 50.4-51.4 GHz band � United States of America 2006-09-03
[ 158 ]
Proposed revisions to draft CPM text for WRC-07 Agenda Item 1.20 � United States of America 2006-09-03
[ 157 ]
Preliminary draft revision of Annex 20 of Recommendation ITU-R SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and the FSS (Earth-to-space) service systems operating in the 50.4-51.4 GHz band � Canada 2006-09-01
[ 156 ]
Proposed modifications to the draft revision of the technical appendix to Annex 1 towards the preliminary revision of Recommendation ITU-R SM.1633 ("Methodology") � Canada 2006-09-01
[ 155 ]
Preliminary draft revision to Annex 19 of Recommendation SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and FSS (Earth-to-space) systems operating in the 47.2-50.2 GHz band � Canada 2006-09-01
[ 154 ]
Proposed modifications to the draft CPM text for WRC-07 Agenda Item 1.21 (Chapter 2 of the CPM report) � Canada 2006-09-01
[ 153 ]
Proposed modifications to Annex [RAS-3] - Compatibility analysis between radio astronomy service systems operating in the 406.1-410 MHz band and mobile-satellite service (space-to-Earth) systems operating in the 400.15-401 MHz band � Canada 2006-09-01
[ 152 ]
Proposed modifications to Annex [RAS-1] - Compatibility analysis between radio astronomy service systems operating in the 150.05-153.0 MHz band and mobile-satellite service (space-to-Earth) systems operating in the 137-138 MHz band � Canada 2006-09-01
[ 151 ]
Draft CPM text for WRC-07 Agenda Item 1.21 (Chapter 2 of the CPM report) � Korea (Republic of) 2006-09-01
[ 150 ]
Proposed modification to the draft CPM text for WRC-07 Agenda Item 1.20 (Chapter 2 of the CPM report) � Sweden , Switzerland (Confederation of) , France 2006-09-01
[ 149 ]
ABU views on WRC-2007 agenda item 1.21 � Asia-Pacific Broadcasting Union (ABU) 2006-08-30
[ 148 ]
Estimation of the EPFD (space-to-Earth) levels produced by unwanted emissions from the Mobile satellite service in the 322-328.6 MHz frequency band � Russian Federation 2006-08-23
[ 147 ]
Analysis of unwanted emissions from the GALILEO system in the Radioastronomy frequency bands of 1 610.6-1 613.8 MHz � Russian Federation 2006-08-23
[ 146 ]
Interference to passive sensors in the 10.6-10.7 GHz band � WMO 2006-07-28
[ 145 ] �
Liaison statement to TG 1/9 - Information relating to WRC-07 Agenda item 1.20 � WP's 9B and 9D 2006-07-24
[ 144 ]
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336 � WP 9D 2006-07-19
[ 143 ]
+Ann.1-24
Report to Task Group 1/9 on its fourth meeting (24-28 April 2006) with a view to its next meeting (11-15 September 2006) � Chairman, TG 1/9 2006-04-28
[ 142 ] �
Final List of Participants � N/A � 2006-04-27
[ 141 ]
Liaison statement to TG 1/9 and WP 7C - Response to request for additional 1 215-1 400 MHz radar system information and comments on proposed limit for radar emission levels in the 1 400-1 427 MHz band � WP 8B 2006-04-24
[ 140 ]
ABU views on WRC-2007 agenda item 1.21 � BR Secretariat 2006-04-24
Results:189 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2004-05-06