Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 79 ]
�
� |
Draft Revision of Question ITU-R 201-2/7 - Two-way time and frequency transfer through communication satellites
�
� |
Working Party 7A
� |
� |
2007-09-28 |
|
[ 78 ]
�
� |
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7
�
� |
Chairman, SG 7
� |
� |
2007-03-30 |
|
[ 77 ]
�
� |
Final List of Participants - Study Group 7 (Geneva, 5 & 12 February 2007)
�
� |
Director, BR
� |
� |
2007-02-12 |
|
[ 76 ]
�
� |
Executive report of Working Party 7A
�
� |
Chairman, WP 7A
� |
� |
2007-02-12 |
|
[ 75 ]
�
� |
Note to Director, Radiocommunication Bureau from the Chairman, Study Group 7
�
� |
Chairman, SG 7
� |
� |
2007-02-12 |
|
[ 74 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2007-02-09 |
|
[ 73 ]
�
(Rev.1)� |
Review of Study Group 7 ITU-R Recommendations to which no substantial revisions have been made in the past 10-15 years
�
� |
Vice-Chairmen SG 7
� |
� |
2007-02-09 |
|
[ 72 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R RS.[RHF] - Technical and operational characteristics of Earth exploration-satellite service systems operating above 3 000 GHz
�
� |
WP 7C
� |
235/7
� |
2007-02-09 |
|
[ 71 ]
�
� |
Draft new Recommendation ITU-R SA.[8 GHz USE] - System design guidelines for Earth exploration-satellites operating in the band 8 025-8 400 MHz
�
� |
WP 7B
� |
139/7
� |
2007-02-09 |
|
[ 70 ]
�
� |
Draft new Report ITU-R RA.[RFI] - Techniques for mitigation of radio frequency interference in radio astronomy
�
� |
WP 7D
� |
237/7
� |
2007-02-09 |
|
[ 69 ]
�
� |
Draft New Report ITU-R RS.[9 GHz COMPAT] - Studies related to the compatibility between EESS (active) and the radiodetermination service in the 9 300-9 500 MHz and 9 800-10 000 MHz bands and between EESS (active) and the fixed service in the 9 800-10 000 MHz band
�
� |
WP 7C
� |
� |
2007-02-09 |
|
[ 68 ]
�
� |
Draft New Recommendation ITU-R SA.[MET 18 GHz] - System characteristics and interference criteria for meteorological satellite systems operating around 18 GHz
�
� |
SG 7
� |
� |
2007-02-09 |
|
[ 67 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R RS.[10/36 GHz MITIGATE] - Technical and operational characteristics for passive sensors in the Earth exploration-satellite (passive) service to facilitate sharing of the 10.6-10.68 GHz and 36-37 GHz bands with the fixed and mobile services
�
� |
WP 7C
� |
232/7
� |
2007-02-09 |
|
[ 66 ]
�
� |
Draft New Report ITU-R RS.[10.6 GHz SHARING] - Sharing of the 10.6-10.68 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)
�
� |
WP 7C
� |
232/7
� |
2007-02-09 |
|
[ 65 ]
�
� |
Draft new Report ITU-R RS.[36-37 GHz SHARING] - Sharing of the 36-37 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)
�
� |
WP 7C
� |
232/7
� |
2007-02-09 |
|
[ 64 ]
�
� |
Liaison statement from Working Party 4A - The applicability of Recommendation ITU-R S.1432 to the frequency band 18.0-18.4 GHz
�
� |
WP 4A
� |
� |
2007-02-06 |
|
[ 63 ]
�
� |
Document number not used
�
� |
N/A
� |
� |
2007-02-12 |
|
[ 62 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2007-02-02 |
|
[ 61 ]
�
� |
Proposed modifications to draft new Recommendation ITU-R SA.[8 GHZ Use] - Use of the 8 025-8 400 MHz band by the Earth Exploration-Satellite Service
�
� |
Canada
� |
139/7
� |
2007-01-26 |
|
[ 60 ]
�
(Rev.1-2)� |
Review of the Questions assigned to SG 7
�
� |
Vice-Chairman SG 7
� |
� |
2007-01-23 |
|
[ 59 ]
�
� |
Executive Report on the meeting of Working Party 7C
�
� |
Chairman, WP 7C
� |
� |
2007-01-26 |
|
[ 58 ]
�
� |
Executive Report on meeting of Working Party 7D (November 2005 and August 2006)
�
� |
Chairman, WP 7D
� |
� |
2007-01-23 |
|
[ 57 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
�
� |
Coordination Committee for Vocabulary (CCV)
� |
� |
2007-01-11 |
|
[ 56 ]
�
� |
Executive Report on the meetings of WP 7B - (November 2005 and August 2006)
�
� |
Chairman, WP 7B
� |
� |
2007-01-09 |
|
[ 55 ]
�
� |
Draft new Recommendation ITU-R SA.[MET 18 GHz] - System characteristics and sharing criteria for meteorological satellite systems operating around 18 GHz
�
� |
Eumetsat
� |
� |
2006-12-19 |
|
[ 54 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SA.1015 - Bandwidth requirements for deep-space research
�
� |
WP 7B
� |
� |
2006-09-14 |
|
[ 53 ]
�
� |
Draft new Recommendation ITU-R SA.[PATTERN SRS] - Reference antenna patterns of large-aperture space research service earth stations to be used for compatibility analyses involving a large number of distributed interference entries in the bands 31.8-32.3 GHz and 37.0-38.0 GHz
�
� |
WP 7B
� |
� |
2006-09-14 |
|
[ 52 ]
�
� |
Draft new Report ITU R SA.[SRS ANT] - Mathematical gain models of large-aperture SRS earth station antennas for compatibility analysis involving a large number of distributed interference sources
�
� |
WP 7B
� |
� |
2006-09-14 |
|
[ 51 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SA.[THz-SPACE-to-SPACE] - Technical and operational characteristics of space-to-space communication systems operating around 354 and 366 THz
�
� |
WP 7B
� |
235/7
� |
2006-09-14 |
|
[ 50 ]
�
� |
Draft new Recommendation ITU-R SA.[8 GHz USE] - Use of the 8 025-8 400 MHz band by Earth exploration satellites
�
� |
WP 7B
� |
139/7
� |
2006-09-14 |
|
[ 49 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RA.1031-1 - Protection of the radio astronomy service in frequency bands shared with other services
�
� |
WP 7D
� |
145/7
� |
2006-09-14 |
|
[ 48 ]
�
(Rev.1)� |
Draft new Report ITU-R RA.[PULSAR] - Radio observations of pulsars for precision timekeeping
�
� |
WP 7D
� |
� |
2006-09-14 |
|
[ 47 ]
�
� |
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7
�
� |
Chairman, SG 7
� |
� |
2006-01-25 |
|
[ 46 ]
�
� |
Liaison statement to Study Group 7
�
� |
SC-WP
� |
� |
2006-01-24 |
|
[ 45 ]
�
� |
Liaison statement to ITU-R SGs - Request for registration and dissemination of ITU-T technology watch function
�
� |
TSAG
� |
� |
2005-11-17 |
|
[ 44 ]
�
� |
Final List of Participants - Study Group 7
�
� |
Director, BR
� |
� |
2005-11-15 |
|
[ 43 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2005-11-14 |
|
[ 42 ]
�
� |
Liaison statement to ITU-R Study Groups from the Coordination Committee for Vocabulary
�
� |
Coord. Committee for Vocabulary
� |
� |
2005-11-14 |
|
[ 41 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RA.611 - Protection of the radio astronomy service from spurious emissions
�
� |
WP 7D
� |
145/7
� |
2005-11-14 |
|
[ 40 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R RA.[EESS-RAS] - Mutual planning between the EESS (active) and the RAS in the 94 GHz and 130 GHz bands
�
� |
WP 7D
� |
129/7
� |
2005-11-14 |
|
[ 39 ]
�
� |
Draft liaison statement from Study Group 7 to the special committee on regulatory/procedural matters - Optional information for the advance publication of a non geostationary-satellite network not subject to coordination under section II of Article 9
�
� |
WP 7B
� |
� |
2005-11-14 |
|
[ 38 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RA.517-3 - Protection of the radio astronomy services from transmitters operating in adjacent bands
�
� |
WP 7D
� |
� |
2005-11-14 |
|
[ 37 ]
�
� |
Liaison statement to the Radiocommunication Bureau - Examination under No.S11.32 of frequency assignments relating to an inter-satellite (space-to-space) network composed of a space station on a geostationary satellite and a space station on a non-geostationary satellite
�
� |
WP 7B
� |
� |
2005-11-14 |
|
[ 36 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SA.1165-1 - Technical characteristics and performance criteria for systems in the meteorological aids service in the 403 MHz and 1 680 MHz bands
�
� |
WP 7C
� |
� |
2005-11-14 |
|
[ 35 ]
�
� |
Draft new Question ITU-R [Doc. 7/35] - Interference to standard-frequency and time signal services in the low-frequency band caused by noise from electrical sources
�
� |
WP 7A
� |
� |
2005-11-11 |
|
[ 34 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SA.[MITIGATE] - Mitigation technique to facilitate the use of the 1 215-1 300 MHz band by the Earth exploration-satellite service (active) and the space research service (active)
�
� |
WP 7C
� |
� |
2005-11-11 |
|
[ 33 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.1166-2 - Performance and interference criteria for spaceborne active sensors
�
� |
WP 7C
� |
� |
2005-11-11 |
|
[ 32 ]
�
� |
Draft new Report ITU-R SA.[ACTIVE 13.5 GHz]
�
� |
WP 7C
� |
� |
2005-11-11 |
|
[ 31 ]
�
(Rev.1)� |
Draft revised Recommendation ITU-R SA.577-5 - Preferred frequencies and required bandwidths for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services
�
� |
WP 7C
� |
� |
2005-11-11 |
|
[ 30 ]
�
� |
Summary Report of actions taken on the first day of the meeting of Radiocommunication Study Group 7 (7 November 2005)
�
� |
Chairman, SG 7
� |
� |
2005-11-11 |
Results:79 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):