Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 29 ]
�
� |
Report of the seventh meeting - (Geneva, 24-28 November 2003)
�
� |
Principal Rapporteurs, JRG 8A-9B
� |
� |
2004-01-06 |
|
[ 28 ]
�
� |
Final List of Participants - Joint Rapporteur Group 8A-9B
�
� |
Director, BR
� |
� |
2003-11-27 |
|
[ 27 ]
�
� |
Preliminary draft revision to Recommendation ITU-R S.1427
�
� |
Director, BR
� |
� |
2003-11-25 |
|
[ 26 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2003-11-21 |
|
[ 25 ]
�
� |
Wireless broadband and convergence studies in ITU-R
�
� |
Brazil (Federative Republic of)
� |
140/9
� |
2003-11-20 |
|
[ 24 ]
�
� |
Broadband wireless access (BWA) and IEEE 802.16: a mobile service provider's view
�
� |
Israel (State of)
� |
140/9
� |
2003-11-20 |
|
[ 23 ]
�
� |
Discussion of the future work of ITU-R JRG 8A-9B
�
� |
Canada
� |
� |
2003-11-20 |
|
[ 22 ]
�
� |
Some examples of wireless broadband solutions and initiatives for rural and remote communications in Canada
�
� |
Canada
� |
142-2/9, 140-4/9, 215-1/8, 212-2/8
� |
2003-11-20 |
|
[ 21 ]
�
� |
Broadband fixed wireless standards - IEEE 802.16 and ETSI HiperMAN
�
� |
Alvarion
� |
� |
2003-11-20 |
|
[ 20 ]
�
+Add.1� |
Deployment in rural areas: IEEE 802.16a and ITU-D Q. 20/2
�
� |
Israel (State of)
� |
20/2, 140/9
� |
2003-11-19 |
|
[ 19 ]
�
� |
Results of GSC-8 on wireless access, including RLANs
�
� |
Principal Rapporteur, JRG 8A-9B (WP 8A)
� |
142/9, 212/8
� |
2003-11-19 |
|
[ 18 ]
�
� |
Proposal for additional elements for the working document developed by Working Party 9B concerning technical characteristics of broadband FWA systems conveying IP packets or ATM cells
�
� |
Japan
� |
� |
2003-11-19 |
|
[ 17 ]
�
� |
Frequency sharing between RLANs in the mobile service and fixed wireless access (FWA) systems in the fixed service in Region 3 in the band 5 250-5 350 MHz
�
� |
Japan
� |
142/9, 140/9, 215/8, 212/8
� |
2003-11-19 |
|
[ 16 ]
�
� |
Proposed comments on Document 8A-9B/189 developed by Working Party 9D - Preliminary draft new Recommendation ITU-R F.[FS/NWA SHARING] - Protection criteria for point-to-point fixed wireless systems sharing the same frequency band with nomadic wireless access systems in the 4 to 6 GHz range
�
� |
Japan
� |
133/9
� |
2003-11-18 |
|
[ 15 ]
�
� |
Proposal to suppress JRG 8A-9B and to reorganise the work within parent Working Parties 8A and 9B
�
� |
France
� |
� |
2003-11-18 |
|
[ 14 ]
�
� |
Radio local area network protection criteria
�
� |
IEEE
� |
215/8, 212/8, 1/8
� |
2003-11-18 |
|
[ 13 ]
�
� |
IEEE 802.16 Working Group on broadband wireless access
�
� |
Director, BR
� |
� |
2003-11-18 |
|
[ 12 ]
�
� |
Discussion of the future activities of JRG 8A-9B
�
� |
Korea (Republic of)
� |
140/9
� |
2003-11-17 |
|
[ 11 ]
�
� |
Throughput measurements and new applications for wireless LAN
�
� |
Korea (Republic of)
� |
205/8
� |
2003-11-17 |
|
[ 10 ]
�
� |
Liaison statement to ITU-R Working Parties 8A and 9B and to Joint Working Party 8A-9B - Reply to letter from Mr. Marks, Chair IEEE 802.16 of 21 October 2003 on co-operation request
�
� |
ITU-T SG 15
� |
� |
2003-11-11 |
|
[ 9 ]
�
� |
Liaison statement to ITU-R WP 8A, WP 9B and JRG 8A-9B - Reply to letter from Mr. Marks, Chair IEEE 802.16 of 21 October 2003 on co-operation request: ANT Standardization Plan and Work Plan
�
� |
ITU-T SG 15
� |
� |
2003-11-11 |
|
[ 8 ]
�
� |
Discussion of the status of JRG 8A-9B
�
� |
United States of America
� |
� |
2003-11-10 |
|
[ 7 ]
�
� |
Summary of results of RA-03, WRC-03 and CPM06-1
�
� |
Chairman, SG 9
� |
� |
2003-11-05 |
|
[ 6 ]
�
� |
Liaison to JRG 8A-9B on compatibility studies between ultra-wideband devices and radiocommunication services
�
� |
TG 1/8
� |
� |
2003-11-05 |
|
[ 5 ]
�
� |
JRG 8A-9B Future activities
�
� |
Israel (State of)
� |
140-4/9
� |
2003-11-04 |
|
[ 4 ]
�
� |
Report on the results of SG 8, RA-03 and WRC-03 of interest to JRG 8A-9B
�
� |
Principal Rapporteurs, 8A-9B
� |
� |
2003-11-04 |
|
[ 3 ]
�
� |
Collaboration between IEEE 802.16 Project and ITU-R
�
� |
Director, BR
� |
� |
2003-10-31 |
|
[ 2 ]
�
� |
ITU-D studies on broadband access technologies
�
� |
Principal Rapp., JRG 8A-9B
� |
� |
2003-10-31 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2000-2003 study period
�
� |
JRG 8A-9B
� |
� |
2003-07-21 |
Results:29 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):