Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 418 ]
�
� |
Liaison statement to JCG 8F-8D
�
� |
WP 8F
� |
� |
2003-04-25 |
|
[ 417 ]
�
� |
Review of results of Study Group 8 documents
�
� |
Chairman, WP 8D
� |
� |
2003-04-10 |
|
[ 416 ]
�
� |
Liaison statement to WP 4A, WP 6S, WP 7C, WP 8D: Extension of the coordination ARC for identification of affected administrations
�
� |
SAT-BAG
� |
� |
2003-03-12 |
|
[ 415 ]
�
� |
Liaison statement - Preparation of a new ITU project on next generation network by SG 13
�
� |
ITU-T SG 13
� |
� |
2003-02-28 |
|
[ 414 ]
�
� |
Liaison statement to ITU-R Study Groups 1, 4, 6 and 8 - Satellites regulation in developing countries
�
� |
Rapporteur for ITU-D
� |
17/1
� |
2003-02-28 |
|
[ 413 ]
�
� |
Liaison statement - Coordination and management of the GII Project
�
� |
ITU-T SG 13
� |
� |
2003-02-28 |
|
[ 412 ]
�
� |
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
�
� |
ITU-T SG 15
� |
� |
2003-02-05 |
|
[ 411 ]
�
� |
Liaison statement to Study Group 8, Working Parties 8A, 8B, 8D, 8F and JRG 8A-9B: Ultra-Wideband technology
�
� |
TG 1/8
� |
� |
2003-01-24 |
|
[ 410 ]
�
� |
Liaison statement on the ITU-T IP project to all ITU-T Study Groups, ITU-R Working Groups, IETF
�
� |
ITU-T SG 13
� |
� |
2002-12-09 |
|
[ 409 ]
�
� |
Liaison statement to all ITU-T Study Groups, ITU-R Working Groups, ETSI on the ITU-T NGN 2004 project
�
� |
ITU-T SG 13
� |
� |
2002-12-09 |
|
[ 408 ]
�
� |
Liaison statement from ITU-T SG 13 on Multicast Support in Satellite UMTS
�
� |
ITU-T SG 13
� |
� |
2002-12-09 |
|
[ 407 ]
�
� |
Report of the fourteenth meeting of Working Party 8D
�
� |
Chairman, WP 8D
� |
� |
2002-10-25 |
|
[ 406 ]
�
� |
Liaison statement to WP 8D - Update of Recommendations ITU-R M.1455 and M.1457
�
� |
WP 8F
� |
� |
2002-10-17 |
|
[ 405 ]
�
� |
Liaison statement to TG 1/8, copied to SG 8 and WPs 8A, 8B and 8D - Compatibility between devices using ultra-wideband (UWB) technology and IMT-2000 systems and beyond
�
� |
N/A
� |
� |
2002-10-17 |
|
[ 404 ]
�
� |
Liaison statement to Working Party 8D - Compatibility of non-GSO mobile-satellite service feeder links in frequency bands near 1 400 MHz with the operation of systems of the EESS in nearby frequency bands
�
� |
WP 7C
� |
� |
2002-10-09 |
|
[ 403 ]
�
� |
Liaison statement to WP 8D - Sharing and compatibility analyses between the RAS and a possible new allocation to the MSS (Earth-to-space) in the band 1 668-1 675 MHz
�
� |
WP 7D
� |
� |
2002-10-09 |
|
[ 402 ]
�
� |
Liaison statement to Task Group 1/8, copied to Study Group 8 and Working Parties 8A, 8D and 8F - Compatibility between devices using ultra-wideband (UWB) technology and the maritime mobile, aeronautical mobile and radiodetermination services
�
� |
WP 8B
� |
� |
2002-09-24 |
|
[ 401 ]
�
� |
Liaison statement to Working Party 8D - Sharing between aeronautical mobile telemetry and MSS in the band 1518-1525 MHz
�
� |
WP 8B
� |
� |
2002-09-24 |
|
[ 400 ]
�
� |
Final List of Participants - Working Party 8D
�
� |
Director, BR
� |
� |
2002-09-24 |
|
[ 399 ]
�
� |
Liaison statement to Task Group 1/7 and Working Parties 4A, 4-9S, 7C, 7D, 8B and 8D - Further comments on CPM text for Agenda items 1.82 and 1.32 (WRC-03) and on preliminary draft Recommendation ITU-R SM.[BbB]
�
� |
WP 6S
� |
� |
2002-09-19 |
|
[ 398 ]
�
� |
List of documents issued
�
� |
BRSGD
� |
� |
2002-09-18 |
|
[ 397 ]
�
� |
Proposed revision of the IMT-2000 satellite radio interface E - Specifications in Recommendation ITU-R M.1455
�
� |
Inmarsat
� |
� |
2002-09-13 |
|
[ 396 ]
�
� |
Working document toward suppression of PDNR on sharing between AMT and GSO MSS (Doc. 8D/340)
�
� |
United States of America
� |
� |
2002-09-13 |
|
[ 395 ]
�
� |
Working document on assessment of per satellite PFD limit
�
� |
United States of America
� |
� |
2002-09-13 |
|
[ 394 ]
�
� |
Working document on factors and techniques which contribute to the satisfactory operation on radars and RNSS signals in the 1 215-1 300 MHz band
�
� |
United States of America
� |
� |
2002-09-13 |
|
[ 393 ]
�
� |
PDNR - Operation of non-GSO mobile-satellite service feeder links in frequency bands near 1 400 MHz with the operation of systems of the EESS in nearby frequency bands
�
� |
United States of America
� |
� |
2002-09-13 |
|
[ 392 ]
�
� |
Working document on topics related to revision of Recommendation ITU-R M.1480
�
� |
United States of America
� |
� |
2002-09-13 |
|
[ 391 ]
�
� |
Revision of the IMT-2000 satellite radio interface E specifications in Recommendation ITU-R M.1457
�
� |
INMARSAT
� |
� |
2002-09-12 |
|
[ 390 ]
�
� |
Draft new Recommendation ITU-R M.[RNSS2] - Methodology for assessing the aggregate epfd from all RNSS satellites of all RNSS systems operating in the 1 164-1 215 MHz band
�
� |
France
� |
� |
2002-09-13 |
|
[ 389 ]
�
� |
Proposed change to PDNR ITU-R M.[RNSS2] - Methodology for assessing the aggregate epfd from all RNSS satellites of all RNSS systems operating in the 1 164-1 215 MHz band
�
� |
United States of America
� |
� |
2002-09-13 |
|
[ 388 ]
�
� |
Synopsis of the United Kingdom's studies within the M.1480 Reflector
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2002-09-12 |
|
[ 387 ]
�
� |
The methodology for estimating the aggregate epfd from all RNSS satellites to the RNS systems operating in the frequency band 1 164-1 215 MHz
�
� |
Russian Federation
� |
� |
2002-09-12 |
|
[ 386 ]
�
� |
Draft revision of Recommendation ITU-R M.818-1
�
� |
France
� |
� |
2002-09-12 |
|
[ 385 ]
�
� |
Proposal for draft new Recommendation on sharing between GSO MSS systems and aeronautical mobile telemetry systems in the band 1 518-1 525 MHz
�
� |
United Arab Emirates
� |
� |
2002-09-12 |
|
[ 384 ]
�
� |
Report of the Correspondence Group (WP8D-Res226) activities
�
� |
Coordinator of the Corresp. Group for Res. 226
� |
� |
2002-09-12 |
|
[ 383 ]
�
� |
Comments on revision of Recommendation M.1480 - Essential technical requirements of mobile Earth stations of geostationary mobile-satellite systems that are implementing the Global mobile personal communications by satellite (GMPCS) - Memorandum of understanding arrangements in parts of the frequency band 1-3 GHz
�
� |
France
� |
� |
2002-09-12 |
|
[ 382 ]
�
� |
Calculation of the epfd level produced by a single NGSO RNSS system: example of application of the methodology contained in Annex 1-1 of the PDNR containing the methodology for assessing the aggregate epfd from all RNSS satellites of all RNSS systems operating in the band 1 164-1 215 MHz band
�
� |
France
� |
� |
2002-09-12 |
|
[ 381 ]
�
� |
Considerations for sharing the frequency band 1 215 to 1 300 MHz between RNSS and radars in the radiodetermination service (Agenda item 1.15 - Resolution 606)
�
� |
Canada
� |
� |
2002-09-12 |
|
[ 380 ]
�
� |
Discussion of AMS(R)S resource provisioning
�
� |
Canada
� |
� |
2002-09-12 |
|
[ 379 ]
�
� |
Scenarios to be considered for sharing studies between the terrestrial and the satellite component of IMT-2000 in the 2.5 GHz band
�
� |
France
� |
� |
2002-09-12 |
|
[ 378 ]
�
� |
Draft Liasison Statement to WP 8F on the Revision of Recommendation ITU-R M.1036-1
Spectrum considerations for implementation of International Mobile Telecommunications-2000 (IMT-2000) in the bands
1 885-2 025 MHz and 2 110-2 200 MHz
�
� |
Italy
� |
� |
2002-09-11 |
|
[ 377 ]
�
� |
Proposed liaison statement to WP 7D - Adjacent band compatibility between mobile earth stations operating in the band 1 670-1 675 MHz and the radioastronomy service
�
� |
Inmarsat
� |
� |
2002-09-11 |
|
[ 376 ]
�
� |
Proposed revisions to Recommendations ITU-R M.1143 and ITU-R M.1319
�
� |
Canada
� |
� |
2002-09-11 |
|
[ 375 ]
�
� |
Some operational and environmental factors related to air traffic control surveillance radars in the frequency band 1 215-1 300 MHz
�
� |
Canada
� |
� |
2002-09-11 |
|
[ 374 ]
�
� |
Proposed modifications to Recommendation ITU-R M.1184-1 - Technical characteristics of mobile satellite systems in the frequency bands below 3 GHz for use in developing criteria for sharing between the mobile-satellite service (MSS) and other services
�
� |
Canada
� |
� |
2002-09-11 |
|
[ 373 ]
�
� |
Items for further study on performance objectives for packet network transmission in the mobile-satellite service
�
� |
Japan
� |
� |
2002-09-10 |
|
[ 372 ]
�
� |
Contribution to the work plan for determination of feasibility and practicability of prioritization and real-time pre-emptive access between different networks of MSS in the bands 1 545-1 555 MHz and 1 646.5-1 656.6 MHz
�
� |
Japan
� |
� |
2002-09-10 |
|
[ 371 ]
�
� |
Response from WP 6E to liaison statements from WP 4A, WP 6S and TG 6/8 and liaison statement to WP 7D, WP 8A, WP 8B, WP 8D and WP 9D
�
� |
WP 6E
� |
268/11
� |
2002-09-10 |
|
[ 370 ]
�
� |
Working document on factors and techniques which contribute to the satisfactory operation on radars and RNSS signals in the 1 215-1 300 MHz band
�
� |
United States of America
� |
� |
2002-09-05 |
|
[ 369 ]
�
� |
Proposed draft new Recommendation ITU-R M.[Packet] - Basic reference models and performance parameters of IP packet network transmission in the mobile-satellite service
�
� |
Correspondence Group for MSS
� |
� |
2002-08-26 |
Results:418 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):