International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : TG6/7 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�TG6/7� C�

ITU-R�TG6/7

Planning parameters for digital broadcasting at frequencies below 30 MHz

Results:63 total items.
Result page:� 1 - 2 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 63 ]
Preliminary Annexes to Chairman's Report � BRSGD 2002-10-28
[ 62 ]
Final List of Participants - Task Group 6/7 � N/A � 2002-09-12
[ 61 ]
List of documents issued � BRSGD 2002-09-10
[ 60 ]
Measured RF-protection ratios for digital sound broadcasting in the MF band using the IBOC DSB system � United States of America 223/10 2002-09-09
[ 59 ]
Liaison statement to WP 1A and TG 6/7 - Draft revision of Recommendation ITU-R SM.1541 - Annex 7 � WP 6E 2002-09-06
[ 58 ]
Liaison statement to WPs 1A, 7D, 8A, 8B, 9C and TG 6/7 - Response to Liaison statement to WP 6E and TG 6/7 concerning compatibility between radiocommunication systems and high data telecommunication systems using electricity power supply or telephone distributing wiring (ITU-R Q. 221/1) � WP 6E 221/1, 32/6 2002-09-06
[ 57 ]
Digital broadcasting in band 7 (HF) in the tropical zone � India (Republic of) 2002-09-05
[ 56 ]
Liaison statement to Task Group 6/7 - Concerning - HF propagation prediction methods for digital broadcasting � Chairman, WP 3L 2002-09-03
[ 55 ]
Revision of calculated RF-protection ratios for digital sound broadcasting (DRM) in the broadcasting bands below 30 MHz � Digital Radio Mondiale (DRM) 223/10 2002-09-02
[ 54 ]
Protection requirement of HF broadcasting against interference from radiation by wired telecommunication systems � Japan 32/6 2002-08-26
[ 53 ]
Status of texts of Study Group 6, its Working Parties and Task Groups � BR Secretariat 2002-08-21
[ 52 ]
Determination of required power reduction for digital sound broadcasting from existing RF protection ratios � NDR 223/10 2002-08-15
[ 51 ]
Use of out-of-band and spurious domains � WP 1A 2002-08-06
[ 50 ]
Liaison statement to WP 6E and TG 6/7 concerning compatibility between radiocommunication systems and high data telecommunication systems using electricity power supply or telephone distributing wiring (ITU-R Q.221/1) � WP 1A 2002-07-31
[ 49 ]
Liaison statement to Working Party 6E and Task Group 6/7 - Draft revision of Recommendation ITU-R SM.1541 - Annex 7 � WP 1A 2002-07-31
[ 48 ]
Liaison statement to TG 6/7 and WP 9C concerning HF propagation prediction methods � WP 3L 2001-09-17
[ 47 ]
Liaison statement to Task Group 6/7 - Technical characteristics of systems in the aeronautical radionavigation and aeronautical mobile services in relation to sharing criteria with digital broadcasting � WP 8B 223/10 2001-09-17
[ 46 ]
+Corr.1
Report of the fifth meeting of Study Group 6 � Chairman, SG 6 2002-09-10
[ 45 ]
Liaison statement to TG 6/7 - Information to develop sharing methods that apply between digital broadcasting and fixed service � WP 9C 2001-09-17
[ 44 ]
(Rev.1)
Report of the third meeting of Task Group 6/7 (Geneva, 11-13 Mars 2002) � Chairman, TG 6/7 2001-09-17
[ 43 ]
Request for review of Questions in force � Chairman, SG 6 2001-09-17
[ 42 ]
List of documents issued � BRSGD 2001-09-17
[ 41 ]
IBO DSB system - Ability to meet service requirements � United States of America 2001-09-17
[ 40 ]
Digital sound broadcasting (DSB) below 30 MHz � United States of America 2001-09-17
[ 39 ]
Laboratory and field testing of the IBOC Digital Sound Broadcasting ("DSB") system operating below 30 MHz � United States of America 2001-09-17
[ 38 ]
Status of introduction of Digital Sound Broadcasting (DSB) � United States of America 2001-09-17
[ 37 ]
Update on minimum usable field strengths for digital sound broadcasting (DRM) in frequency bands below 30 MHz � Digital Radio Mondiale 2001-09-17
[ 36 ]
Calculated RF-protection ratios for digital sound broadcasting (DRM) in the broadcasting bands below 30 MHz � Digital Radio Mondiale 2001-09-17
[ 35 ]
Status of texts of Study Group 6, its Working Parties and Task Group � BR, Secretariat 2001-09-17
[ 34 ]
Response to Liaison statement from Task Group 6/7 on planning parameters for digital broadcasting at frequencies below 30 MHz � Chairman, WP 3L 2001-09-17
[ 33 ]
Necessity of worldwide unified requirement for the reception environment to protect HFBC against xDSL and PLC � Japan 2001-09-17
[ 32 ]
Assessment of performance of analogue HF broadcast in the presence of noise and of potential interference from other HFBC transmissions � Director, BR 2001-09-17
[ 31 ]
Report of the fourth meeting of Study Group 6 � Chairman, SG 3 2001-09-17
[ 30 ]
Liaison statement to Task Group 6/7- Sharing methods that apply between digital broadcasting and the fixed service � WP 9C 2001-09-17
[ 29 ]
(Rev.1)
Preliminary Report of the second meeting of Task Group 6/7 (17-19 September 2001) � Chairman, TG 6/7 2001-09-17
[ 28 ]
Liaison statement to TG 6/7 - Sharing methods that apply between digital broadcasting and the aeronautical radionavigation, fixed and mobile services � WP 8A 2001-09-17
[ 27 ]
Proposal for a new category of texts of Study Group 6 to be used as guides to its Recommendations � SG 6 2001-09-17
[ 26 ]
Liaison to all WPs of ITU-R SG 6 and to ITU-T SG 15 - Call for proposal for a common file format for the exchange of video material in file format and for the availability of software to manage and display on a computer monitor the video part of a TV or multimedia signal � WP 6Q 2001-09-17
[ 25 ]
Liaison statement to Task Group 6/7 on planning parameters for digital sound broadcasting in the HF bands allocated to the broadcasting service for the Tropical Zone � WP 6E 2001-09-17
[ 24 ]
Sharing considerations - Report of Sub-Working Group 3 � TG 6/7 2001-09-17
[ 23 ]
List of Documents issued � BRSGD 2002-07-31
[ 22 ]
Receiver intrinsic noise for estimation of the minimum usable field strength � Japan 2001-09-17
[ 21 ]
Calculated RF-protection ratios for digital sound broadcasting (DRM) in the broadcasting bands below 30 MHz � DRM - Digital Radio Mondiale 2001-09-17
[ 20 ]
Status of texts of Study Group 6, its Working Parties and Task Group � BR, Secretariat 2001-09-17
[ 19 ]
Minimum usable field strengths for digital sound broadcasting (DRM) in frequency bands below 30 MHz � DRM (Digital Radio Mondiale) 2001-09-17
[ 18 ]
Updated proposal for treatment of all the questions of Study Group 6 � Chairman, SG 6 2001-09-17
[ 17 ]
(Rev.1)
Response to liaison statement from Task Group 6/7 - Planning parameters for digital broadcasting at frequencies below 30 MHz � Chairman, WP 3L 2001-09-17
[ 16 ]
Liaison statement to Task Group 6/7 - Response to liaison statement from Task Group 6/7 regarding the sharing methods that apply between digital broadcasting and the aeronautical radionavigation, fixed and mobile services � WP 8B 2001-09-17
[ 15 ]
Report of the meeting of Study Group 6 � Chairman, SG 6 2001-09-17
[ 14 ]
Liaison statement to TG 6/7 - Draft Recommendation YYY (WRC-03) - RF protection ratios associated with digital emissions in the HF bands allocated exclusively to the broadcasting service � WP 6E 2001-09-17
Results:63 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2002-10-28