International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : 6S-9D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�6S-9D� C�

ITU-R�6S-9D

Frequency sharing between the fixed service and the BSS

Results:35 total items.
Contributions��Documents / Contributions

Number
Title Source Date
[ 35 ]
+Corr.1
Chairmen's Report of the second meeting of JRG 6S-9D (Geneva, 7-11 March 2002) � Chairmen, JRG 6S-9D 2001-09-27
[ 34 ]
Liaison statement to WP 6S, 6S/SRG-11 and JRG 6S/9D � WP 8F 2001-09-27
[ 33 ]
Liaison statement to WP 6S, 6S/SRG-11 and JRG 6S/9D � WP 8F 2001-09-27
[ 32 ]
Probabilistic analysis of interference from geostationary satellites into the Fixed Service sharing the band 2 630-2 655 MHz � Brunei Darussalam 2001-09-27
[ 31 ]
pfd thresholds applicable to GEO and HEO BSS(s) satellite systems with regards to fixed service in the frequency band 2 630 to 2 655 MHz � France 2001-09-27
[ 30 ]
Consideration of K value for the sector antenna which can be used for the base station of point to multipoint systems in the fixed service � Japan 2001-09-27
[ 29 ]
Proposed revision of Recommendation ITU-R F.1336-1 � Japan 2001-09-27
[ 28 ]
Consideration of the number of BSS (sound) systems which may operate at the same frequency � Japan 2001-09-27
[ 27 ]
Coordination thresholds for non-geostationary space stations using highly elliptical orbits in the broadcasting-satellite service (sound) operating in the 2 630-2 655 MHz frequency band with respect to fixed service � Japan 2001-09-27
[ 26 ]
Threshold levels to determine the need to coordinate between systems in the Broadcasting-Satellite Service (sound) in the geostationary and non-geostationary satellite orbits for space-to-earth transmissions and the fixed service in the band 2 535-2 655 MHz � Japan 2001-09-27
[ 25 ]
Coordination thresholds for geostationary BSS (sound) satellites shared with the fixed service in the band 2 535-2 655 MHz � Japan 2001-09-27
[ 24 ]
Draft elements for CPM text in Chapter 3 relating to WRC-03 Agenda item 1.34 � Japan 2001-09-27
[ 23 ]
Modification of Recommendation ITU-R F.1336-1 � France 2001-09-27
[ 22 ]
Chairmen's Report of the first meeting of JRG 6S-9D � Chairmen, JRG 6S-9D 2001-09-27
[ 21 ]
Liaison statement from WP 9D - Preliminary draft elements for CPM text in Chapter 3 relating to WRC-03 Agenda item 1.34 � WP 9D 2001-09-27
[ 20 ]
Liaison statement to WP 6S and JRG 6S-9D - Some information which may assist the further study on sharing between BSS (sound) � WP 9D 2001-09-27
[ 19 ]
Liaison statement to WP 9D and JRG 6S-9D � WP 8F 2001-09-27
[ 18 ]
Liaison statement to WPs 8A, 8D, 8F, 9D and JRG 6S/9D � WP 6S 2001-09-27
[ 17 ]
Liaison statement to WPs 8A, 8D, 8F, 9D and JRG 6S-9D - On the issue of computing "average antenna gain at a fixed elevation angle for consideration in terrestrial and satellite system sharing studies" � WP 6S 2001-09-27
[ 16 ]
Liaison Statement to JRG 6S-9D - Outline for CPM text relting to WRC-03, Agenda item 1.34 � WP 6S 2001-09-27
[ 15 ]
Reply to liaison statement from Working Party 9D - Possible sharing between airborne BSS (TV) and certain applications of fixed services at 2 500 MHz � WP 6S 2001-09-27
[ 14 ]
Reply to liaison statement from WP 9D - Possible sharing between airborne BSS (TV) and certain applications of fixed services at 2 500 MHz � WP 6S 2001-09-27
[ 13 ]
Reply to Liaison statement from WP 9D � WP 6S 2001-09-27
[ 12 ]
Coordination thresholds for non-geostationary space stations using highly elliptical orbits in the broadcasting-satellite service (sound) operating in the 2 630 - 2 655 MHs frequency band � Japan 2001-09-27
[ 11 ]
PFD coordination thresholds applicable to GSO BSS(S) satellite systems in the frequency band 2 630 to 2 655 MHz � France 2001-09-27
[ 10 ]
Potential interference from 2.5 GHz Electronic News Gathering (ENG) into airborne BSS (TV) and BSS(TV) receivers located at airports and operated at ground level � Australia 2001-09-27
[ 9 ]
Power flux-density limits and the protection of certain FS applications operating in the 2.5 GHz bands � Australia 2001-09-27
[ 8 ]
Additional study on the coordination thresholds for BSS (sound) GSO satellites shared with the fixed service in the 1-3 GHz range � Japan 2001-09-27
[ 7 ]
Liaison Statement to Joint Rapporteur Group 6S-9D-Frequency sharing between the fixed service and the broadcasting-satellite service (sound) in the 1-3 GHz range � WP 9D 2001-09-27
[ 6 ]
Coordination thresholds for geostationary space stations in the broadcasting-satellite service (sound) operating in the 1-3 GHz range � Japan 2001-09-27
[ 5 ]
Effects of orbital non-uniformity on coordination thresholds for geostationary space stations of the broadcasting-satellite service (sound) in the 1-3 GHz range � Japan 2001-09-27
[ 4 ]
Proposed work programme for Joint Rapporteur Group 6S-9D in the study period 2000-2003 � Principal Rapporteurs, JRG 6S-9D 2001-09-27
[ 3 ]
Liaison statement to Joint Rapporteur Group 6S-9D and Working Party 6S � WP 9D 2001-09-27
[ 2 ]
Liaison statement to Working Party 6S and JRG 6S-9D - Appointment of a Special Rapporteur on studies relating to Resolution 540 (WRC-2000) and appointment of a new Principal Rapporteur for JRG 6S-9D � WP 9D 2001-09-27
[ 1 ]
Liaison statement to Working Party 9D - Coordination thresholds for geostationary space stations in the broadcasting-satellite service (sound) operating in the 1-3 GHz range � WP 6S 2001-09-27
Results:35 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2002-08-28