Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP4/9S : Contribuciones : 184 Nuevo�-� Busque los documentos de la reuni�n
[184]� An analysis of the impact to HDFS receivers during times in which Fixed-Satellite Service nominal clear-sky power flix-density levels are be exceeded to overcome fading conditions in the bands 37.5-40 GHz and 42-42.5 GHz, using the methodology.

Formato

Tama�o

Puesta a disposici�n

English

Word

173056 octetos 2001-10-15 [184]�- [4-9S/184] An analysis of the impact to HDFS receivers during times in which Fixed-Satellite Service nominal clear-sky power flix-density levels are be exceeded to overcome fading conditions in the bands 37.5-40 GHz and 42-42.5 GHz, using the methodology.

Documento :

UIT-R�WP4/9S� Contribuci�n� 184

T�tulo :

An analysis of the impact to HDFS receivers during times in which Fixed-Satellite Service nominal clear-sky power flix-density levels are be exceeded to overcome fading conditions in the bands 37.5-40 GHz and 42-42.5 GHz, using the methodology.

Recibido en :

2001-10-15

Origen :

USA

Reuni�n :

2001-10-15

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2002-09-26