|
[GTE99-3/ADM/1] Agenda for the Third Meeting of the GTE | |
[GTE99-3/1] Liaison Statement from WP8A: Frequency sharing between the Mobile Service and the Broadcasting-Satellite Service in the 12 GHz Band | |
[GTE99-3/2] Liaison Statement from WP9D | |
[GTE99-3/3] Liaison Statement from WP4A: Adhering to provision of Annex 7 to Appendices S30/S30A during replanning of Regions 1 & 3 BSS | |
[GTE99-3/4] Minimum orbital separation between a receive BSS feeder-link GSO space station and a transmit BSS or FSS space station in the 17.3-18.4 GHz Band | |
[GTE99-3/5] Liaison statement to GTE from JWP 10-11/S | |
[GTE99-3/6] Liaison statement to the GTE on protection ratios for digital BSS systems | |
[GTE99-3/7] Examination of channel rasters for BSS Replanning studies | |
[GTE99-3/8] Proposals on assignments for China in BSS Replanning studies | |
[GTE99-3/9] Compatibility problems arising during revision of the BSS Plan for Regions 1 and 3 | |
[GTE99-3/10] Croatia contribution to Planning Approach | |
[GTE99-3/11] Summary of Correspondence with Administrations on Orbital Positions and Composite Beams | |
[GTE99-3/12] Basic technical assumptions made in the studies performed by the Bureau | |
[GTE99-3/12-Zip] Basic technical assumptions made in the studies performed by the Bureau | |
[GTE99-3/13] Proposed methodology to implement the new Planning Approach | |
[GTE99-3/14] Note by the secretariat to the Group of Technical Experts (GTE) | |
[GTE99-3/15] Sharing between Region 1 BSS Plan Systems and Region 2 FSS Networks in the Orbital Arc from 37W to 10E | |
[GTE99-3/16] Compatibility issues between Region 1 BSS and Region 3 FSS | |
[GTE99-3/17] Example Down-Link Replanning Exercise by AGTE | |
[GTE99-3/18] Results of Steps 3 and 4 of the "Planning Approach" | |
[GTE99-3/18Rev1] Results of Steps 3 and 4 of the "Planning Approach" | |
[GTE99-3/19] Methodology Used for Compatibility Analyses with other Services and the Region 2 Plan | |
[GTE99-3/20] Results of Compatibility Analises with other Services and the Region 2 Plan | |
[GTE99-3/21] Proposoal concerning assumptions related to multi-national Beams | |
[GTE99-3/23] Report on Work as of the Third Meeting | |
[GTE99-3/24] Liaison statement to GTE from SG4 | |