CONTENTS

�1���� Scope
�2���� References
�3���� Terms and definitions
�4���� Abbreviations
�5���� Exchange of information and coordination
�6���� Measurements
�7���� Bringing into service tests
������� 7.1���� Continuity test
������� 7.2���� Test15m
����� ��7.3���� Test2h
������� 7.4���� Test24h
�8���� Bringing into service procedures
������� 8.1���� Initial measurements of a section
����������������� 8.1.1���� General
����������������� 8.1.2���� BIS testing procedure
������� 8.2���� Initial measurements of a path
����������������� 8.2.1���� Determining the BIS limits
����������������� 8.2.2���� General considerations on BIS testing procedure
������� 8.3���� Bringing into service more than one path at the same time and with identical routing
��������������� ��8.3.1���� Procedure for bringing into service multiple tributaries on an existing higher order path with identical routing
����������������� 8.3.2���� Procedure for bringing into service multiple tributaries on a new higher order path with identical routing
������� 8.4���� BIS of more than one path with not identical routing
������� 8.5���� Contingency planning