This Recommendation deals with planning and constructing buried
telecommunication cables.
It gives information about:
� the
locations where earth potential rise (EPR) may occur;
� the
duration of EPR in different types of power networks;
� "safe
distances" between telecommunication cables and power installations;
� measures to
be taken if the safe distance is not achieved.
Reference is made to the Directives,
Vol. II and III.