Policy on Intellectual Property Right (IPR)
Series of ITU-R Reports
Chapter 1
�1���� Introduction
�2���� National long-term planning process
������� 2.1���� Spectrum requirements definition
������� 2.2���� Spectrum availability
������� 2.3���� Spectrum planning options
������� 2.4���� Spectrum planning implementation
������� 2.5���� The iterative process
�3���� The management or administrative body
Annex 1� to Chapter 1� Influencing Factors
Annex 2� to Chapter 1� Methodology of the long-term spectrum management plan
development
Chapter 2
�1���� Introduction
�2���� The consultative approach
������� 2.1���� Inquiry into future spectrum/service requirements
������� 2.2���� Interaction among/with representative groups
������� 2.3���� Analysis of usage trends
������� 2.4���� Example
�3���� The analytical approach
������� 3.1���� Introduction
������� 3.2���� Steps for the analytical approach development
������� 3.3���� The use of the analytical technique in the long-term spectrum
requirements planning process
Chapter 3
�1���� Identification of long-term spectrum management objectives
�2���� Evaluation of current spectrum management process
�3���� Transition procedures
������� 3.1���� Encourage effective spectrum utilization
����������������� 3.1.1���� Effective use of new technologies to improve the
reuse of frequencies
����������������� 3.1.2���� Channel splitting
����������������� 3.1.3���� Spectrum redeployment
����������������� 3.1.4���� Service overlay and frequency band sharing
����������������� 3.1.5���� Shared radio systems
��������� ��������3.1.6���� Use of the unused spectrum
����������������� 3.1.7���� Use of wireline distribution networks as a
supplement
������� 3.2���� Enhance spectrum use flexibility
������� 3.3���� Maximize the social and economic benefits that can be achieved
by
������� 3.4���� Ensure that the spectrum is used in all regions of the country
where it is needed
������� 3.5���� Build a skilled work force and develop proper spectrum engineering
tools
List of abbreviations