Policy on Intellectual Property Right (IPR)
�1���� Introduction
�2���� Scope
�3���� Related text references
������� 3.1���� List of acronyms and
abbreviations
�4���� Summary of submissions
�5���� Conclusion for Steps 4 to 7
������� 5.1���� Results of Steps 4, �Evaluation
of candidate RITs or SRITs by Evaluation Groups� and Step 5, �Review and
coordination of outside evaluation activities�
����������������� 5.1.1���� Summary of the
evaluations received for the 3GPP technology candidate
����� ������������5.1.2���� Summary of the
evaluations received for the IEEE technology candidate
������� 5.2���� Results of Step 6, �Review to
assess compliance with minimum requirements�
����������������� 5.2.1���� Candidate submission
from IEEE (IMT-ADV/4)
� ����������������5.2.2���� Candidate submission
from Japan (IMT-ADV/5)
����������������� 5.2.3���� Candidate submission
from Japan (IMT-ADV/6)
����������������� 5.2.4���� Candidate submission
from TTA (IMT-ADV/7)
����������������� 5.2.5���� Candidate submission
from 3GPP Proponent (IMT-ADV/8)
����������������� 5.2.6���� Candidate submission
from China (People�s Republic of) (IMT-ADV/9)
������� 5.3���� Result of Step 7, �Consideration
of evaluation results, consensus building and decision�
����������������� 5.3.1���� Consideration of
evaluation results
����������������� 5.3.2���� Consensus building
and decision
�6���� Characteristics of the IMT-Advanced
technologies and basis of the specifications for Step 8
������� 6.1���� Characteristics of radio
interface technologies for IMT-Advanced
������� 6.2���� Detailed specifications for the
radio interface technologies for IMT-Advanced in Step 8
����������������� 6.2.1���� For �LTE-Advanced�
����������������� 6.2.2���� For
�WirelessMAN-Advanced�
Annex 1� Submission of candidate technologies
Annex 2� Summary and details of Evaluation Reports from Independent
Evaluation Groups
Annex 3� Detailed compliance template summaries
�B���� Candidate submission from Japan
(IMT-ADV/5)
�C���� Candidate submission from Japan
(IMT-ADV/6)
�D���� Candidate submission from TTA (IMT-ADV/7)
�E���� Candidate submission from 3GPP Proponent
(IMT-ADV/8)
������� E.1���� FDD RIT
������� E.2���� TDD RIT
�F���� Candidate submission from China (People�s
Republic of) (IMT‑ADV/9)