- REPORT OF THE CPM on operational and regulatory/procedural matters TO THE WORLD RADIOCOMMUNICATION CONFERENCE 2015
- Preface
- Cross-reference between the WRC-15 agenda items and the chapters orsub-chapters of the CPM Report
- CONTENTS
- Introduction to the CPM Report to WRC-15
- Chapter 1 – Mobile and Amateur issues
- 1/1.1/1 Executive summary
- 1/1.1/2 Background
- 1/1.1/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 1/1.1/4 Analysis of the results of studies
- 1/1.1/5 Method(s) to satisfy the agenda item
- 1/1.1/6 Regulatory and procedural considerations
- 1/1.1/6.1 For the frequency band 470-694/698 MHz
- 1/1.1/6.2 For the frequency band 1 350-1 400 MHz
- 1/1.1/6.3 For the frequency band 1 427-1 452 MHz
- 1/1.1/6.4 For the frequency band 1 452-1 492 MHz
- 1/1.1/6.5 For the frequency band 1 492-1 518 MHz
- 1/1.1/6.6 For the frequency band 1 518-1 525 MHz
- 1/1.1/6.7 For the frequency band 1 695-1 710 MHz
- 1/1.1/6.8 For the frequency band 2 700-2 900 MHz
- 1/1.1/6.9 For the frequency band 3 300-3 400 MHz
- 1/1.1/6.10 For the frequency band 3 400-3 600 MHz
- 1/1.1/6.10.1 For Method B, Option B1
- 1/1.1/6.10.2 For Method B, Option B2
- 1/1.1/6.10.3 For Method B, Option B3
- 1/1.1/6.10.4 For Method B, Option B4
- 1/1.1/6.10.5 For Method B, Option B5
- 1/1.1/6.10.6 For Method C, Option C1
- 1/1.1/6.10.7 For Method C, Option C2
- 1/1.1/6.10.8 For Method C, Option C3
- 1/1.1/6.10.9 For Method C, Option C4
- 1/1.1/6.10.10 For Method C, Option C5
- 1/1.1/6.11 For the frequency band 3 600-3 700 MHz
- 1/1.1/6.12 For the frequency band 3 700-3 800 MHz
- 1/1.1/6.13 For the frequency band 3 800-4 200 MHz
- 1/1.1/6.14 For the frequency band 4 400-4 500 MHz
- 1/1.1/6.15 For the frequency band 4 500-4 800 MHz
- 1/1.1/6.16 For the frequency band 4 800-4 990 MHz
- 1/1.1/6.17 For the frequency band 5 350-5 470 MHz
- 1/1.1/6.18 For the frequency band 5 725-5 850 MHz
- 1/1.1/6.19 For the frequency band 5 925-6 425 MHz
- 1/1.2/1 Executive summary
- 1/1.2/2 Background
- 1/1.2/3 Summary of technical and operational studies and relevant ITU-R Recommendations
- 1/1.2/4 Analysis of the results of studies
- 1/1.2/5 Methods to satisfy the agenda item
- 1/1.2/6 Regulatory and procedural considerations
- 1 Consideration of mobile service base stations impact to ground and aircraft aeronautical radionavigation service stations
- 2 Consideration of mobile service user equipment impact on aeronautical radionavigation service ground-based and aircraft stations
- 1 Consideration of mobile service base stations impact to ground-based and aircraft aeronautical radionavigation service stations
- 2 Consideration of mobile service user equipment impact on aeronautical radionavigation service ground-based and aircraft stations
- 1/1.3/1 Executive summary
- 1/1.3/2 Background
- 1/1.3/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 1/1.3/4 Analysis of the results of studies
- 1/1.3/5 Methods to satisfy the agenda item
- 1/1.3/6 Regulatory and procedural considerations
- 1/1.4/1 Executive summary
- 1/1.4/2 Background
- 1/1.4/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 1/1.4/4 Analysis of the results of studies
- 1/1.4/5 Methods to satisfy the agenda item
- 1/1.4/6 Regulatory and procedural considerations
- Chapter 2 – Science issues
- Chapter 3 – Aeronautical, Maritime and Radiolocation issues
- Chapter 4 – Satellite services
- Sub-Chapter 4.1 – Fixed-satellite service
- 4.1/1.6.1 Resolution 151 (WRC-12)
- 4.1/1.6.1/1 Executive summary
- 4.1/1.6.1/2 Background
- 4.1/1.6.1/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 4.1/1.6.1/4 Analysis of the results of studies
- 4.1/1.6.1/5 Methods to satisfy this part of the agenda item
- 4.1/1.6.1/6 Regulatory and procedural considerations
- 4 Limits to the interference into frequency assignments in conformity with the Regions 1 and 3 feeder-link Plan or with the Regions 1 and 3 feeder-link List or proposed new or modified assignments in the Regions 1 and 3 feeder-link List (Rev.WRC-0...
- 6 Limits applicable to protect a frequency assignment in the band 17.8-18.1 GHz (Region 2) to a receiving feeder-link space station in the fixed-satellite service (Earth-to-space) or a frequency assignment in the band 14.5-14.8 GHz (allny regions whe...
- 1 Threshold values for determining when coordination is required between, on one hand, transmitting space stations in the fixed-satellite service or the broadcasting-satellite service and, on the other hand, a receiving space station in the feeder-lin...
- 2 Threshold values for determining when coordination is required between, on one hand, transmitting feeder-link earth stations in the fixed-satellite service in Region 2 in 17.8-18.1 GHz or transmitting earth stations in the fixed-satellite service in...
- 2 Threshold values for determining when coordination is required between transmitting feeder-link earth stations in the fixed-satellite service in Region 2 and a receiving space station in the Regions 1 and 3 feeder-link Plan or List or a proposed new...
- 3 Threshold values for determining when coordination is required between, transmitting earth stations in the fixed-satellite service in 14.5-14.8 GHz not subject to the Regions 1 and 3 feeder-link Plan or List and a receiving space station in the Regi...
- 4.1/1.6.2 Resolution 152 (WRC-12)
- 4.1/1.6.2/1 Executive summary
- 4.1/1.6.2/2 Background
- 4.1/1.6.2/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 4.1/1.6.2/4 Analysis of the results of studies
- 4.1/1.6.2/5 Method(s) to satisfy this part of the agenda item
- 4.1/1.6.2/6 Regulatory and procedural considerations
- 4.1/1.7/1 Executive summary
- 4.1/1.7/2 Background
- 4.1/1.7/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 4.1/1.7/4 Analysis of the results of studies
- 4.1/1.7/5 Method to satisfy the agenda item
- 4.1/1.7/6 Regulatory and procedural considerations
- 4.1/1.8/1 Executive summary
- 4.1/1.8/2 Background
- 4.1/1.8/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 4.1/1.8/4 Analysis of the results of studies
- 4.1/1.8/5 Method(s) to satisfy the agenda item
- 4.1/1.8/6 Regulatory and procedural considerations
- 4.1/1.9.1/1 Executive summary
- 4.1/1.9.1/2 Background
- 4.1/1.9.1/3 Summary of technical and operational studies, including a list of relevant ITU-R Recommendations
- 4.1/1.9.1/4 Analysis of the results of studies
- 4.1/1.9.1/5 Methods to satisfy this part of the agenda item
- 4.1/1.9.1/6 Regulatory and procedural considerations
- Sub-Chapter 4.2 – Mobile-satellite service
- Chapter 5 – Satellite regulatory issues
- Chapter 6 – General issues
- Annexes