WP1/15 interim activities
WP |
Q. |
Topic |
Agenda |
Date |
Location and Host |
1/15 |
2/15 |
Progression of G.984.x series Recommendations, G.985 and G.gbe |
- To progress OMCI for Reach extension
- To progress OMCI for VLAN and updates
- To progress “G.985 Amendment 1 100 Mbit/s point-to-point Ethernet based optical access system”
- Requirements for 1 Gbit/s P2P optical access systems
- Traffic Management
- To progress the G.984.4 Implementers’ Guide
- Update on Power saving and next steps
- Showcase event update
- Liaison
|
17 – 18 April 2008 |
Tokyo, Japan
Hosted by NEC |
1/15 |
2/15 |
Progression of G.984.x series Recommendations, G.985 and G.gbe |
Agenda will be based upon the topics above plus others to be determined |
26 – 27 June 2008 |
Stockholm, Sweden
Hosted by Ericsson |
1/15 |
2/15 |
Progression of G.984.x series Recommendations, G.985 and G.gbe |
Agenda will be based upon the topics above plus others to be determined |
12 September 2008 |
Shanghai, China Hosted by ZTE |
1/15 |
4/15 |
Progression of Home Networking Recommendations |
To progress draft new Recommendation G.hn |
17 - 20 March 2008 |
Nashville, TN, USA
Hosted by Infineon Technologies |
1/15 |
4/15 |
Progression of xDSL and Home Networking Recommendations |
To progress draft new Recommendations G.hn, G.lt, G.inp & G.vector
To progress other DSL Recommendations as required |
7 - 11 April 2008 |
Charleston, SC, USA
Hosted by Infineon Technologies |
1/15 |
4/15 |
Progression of xDSL and Home Networking Recommendations |
To progress draft new Recommendations G.hn, G.lt, G.inp & G.vector
To progress other DSL Recommendations as required |
16 - 20 June 2008 |
Antwerp, Belgium
Hosted by Alcatel-Lucent |
1/15 |
4/15 |
Progression of xDSL and Home Networking Recommendations |
To progress draft new Recommendation G.hn |
21 – 24 July 2008
|
Location:
Pruneyard, CA, USA
Hosted by Copper Gate and Ikanos
|
1/15 |
4/15 |
Progression of Home Networking Recommendations |
To progress draft new Recommendation G.hn |
2 - 5 September 2008
|
Location:
Chicago, Il, USA
Hosted by HomeGrid |
1/15 |
4/15 |
Progression of xDSL and Home Networking Recommendations |
To progress draft new Recommendations G.hn, G.lt, G.inp & G.vector
To progress other DSL Recommendations as required
|
15 - 19 September 2008 |
Location:
Campbell, CA, USA
Hosted by 2-wire |
1/15 |
4/15 |
Progression of Home Networking Recommendations |
To progress draft new Recommendation G.hn |
20 - 24 October 2008
|
Location:
Valencia, Spain
Hosted by DS2
|
1/15 |
4/15 |
G.hn review |
Review the draft Recommendation
Address any technical issues
Carry out an editorial clean-up
|
first week of November 2008 |
Tampa area, Florida, USA |
WP2/15 interim activities
WP |
Q. |
Topic |
Agenda |
Date |
Location/Host |
2/15 |
6/15 |
- to progress draft revised G.698.2 with respect to the inclusion of 40G
application codes and 10G application codes at 50 GHz channel spacing;
- to progress draft revised G.Sup39 with respect to the inclusion of
descriptions of advanced modulation formats;
- to progress the work on the choice of the OTU4 bit rate, especially in
relation to the choice of suitable modulation formats, including initial
considerations on implementations of a short-reach OTU4 interface;
- to consider documents relating to revised G.696.1, revised G.697
and 10Gbit/s applications for G.695
|
Clause 3.3.6
Report WP2 |
Week 23-27 June 2008 |
Munich,
on the kind invitation of
Nokia-Siemens |
2/15 |
7/15 |
- to progress draft revised G.671, in particular with respect PON
splitter issues, aiming to reach consent at the next SG15 meeting in
December 2008;
- to progress G.666 thus also clarifying the direction of work
towards an envisaged revision at the SG15 meeting in October 2009;
- to consider additional documents submitted on the above and other topics as time permits.
|
Clause 3.4.6
Report WP2 |
WP3/15 interim activities
WP |
Q. |
Topic |
Agenda |
Date |
Location/Host |
3 |
9 |
G.8031, G.8032, Synchronous Ethernet, G.808.1, G.808.2 |
- G.8031 including comment resolution, if necessary.
- G.8032 including comment resolution, if necessary.
- Synchronous Ethernet
- G.808.1
- G.808.2
|
28 April-2 May 2008 |
Miami/ATIS |
3 |
9 |
|
- Progress the work on G.8032 and G.8031
|
4-8 August 2008 |
Galway/Nortel |
3 |
9 |
G.8021, G.8031, G.8032, T-MPLS |
- G.8021
- G.8031
- G.8032
- T-MPLS issues (G.8121 and G.8132)
|
22-26 September 2008 |
Jeju Island, South
Korea |
3 |
11 |
Remaining February contributions, OTN, Ethernet Services |
- Continue review of contributions that were left from the February 2008 plenary
- Progress definition of OTN hierarchy
- Define requirements for ODU0/sub-ODU1 and mapping of client signals into it
- Refine priority list with client signals
- Progress work on the G.8011.x series of recommendations.
|
2-6 June 2008 |
Sophia Antipolis/ETSI |
3 |
11 |
OTN, GMP, G.8112, partially joint with Q9 |
- Progress work on the G.8011.x series of Recommendations
- Progress definition of OTN hierarchy
- Define requirements for ODU0 and mapping of client signals into ODU0
- Progress T-MPLS NNI G.8112
|
22-26 September 2008 |
Jeju Island, South Korea |
3 |
12 |
Ethernet and G.800 |
- Advance work on G.800
- Prepare amendment 2 for consent in December 2008
- Continue the alignment of G.800 and G.8010/G.806 terminology and concepts.
- Ethernet
- Complete development of the model for PB
- Complete development of the model for PBB
- Continue work on the description of Provider VLAN Transport
- Prepare a new version of G.8010 for consent in December 2008
- Continue work on G.pbb-te
|
19-23 May 2008 |
Sophia Antipolis/ETSI |
3 |
12+14 |
ASON, Transport equipment management, discovery, DCN, Ethernet, T-MPLS |
- Q12 and Q14 jointly: Advance work on ASON, G.8080 amendment 2 for consent in mid 2009 and G.7716, G.7713 series, G.7714 series, & G.7715 series
- Q12: Complete the preparation of G.8010 for consent at the December 2008 meeting of SG 15.
- This topic will only be addressed if the work is not completed at the Interregnum meeting in May.
- Q12: Advance work on T-MPLS architecture (G.8110.1)
- Q14: Advance work on transport equipment management (all technologies)
- Q14: Advance work on DCN (G.7712) architecture and requirement
|
22-26 September 2008 |
Beijing/ZTE |
3 |
13 |
G.paclock-bis, G.pacmod-bis, time and phase sync intra office
interfaces, G.8261, G.8264 |
- Progress work on G.paclock-bis
- Progress work on G.pacmod-bis, and in particular address 1588 V2 telecom profile
- Progress on packet based methods
- Progress on time and phase synchronization, and intra office interfaces to transport time
- G.8261 and G.8264, including comment resolution, if necessary
|
28 April-2 May 2008 |
Miami/ATIS |
3 |
13 |
G.paclock-bis, G.pacmod-bis, time and phase sync intra office
interfaces, G.8261, G.8264, test methods for packet networks |
- Progress work on G.paclock-bis
- Progress work on G.pacmod-bis, and in particular address 1588 V2 telecom profile
- Progress on packet based methods
- Progress on time and phase synchronization, and intra office interfaces to transport time
- Test methods for packet networks, including jitter and wander measurements
- G.8261
|
22-26 September |
Rome/Ericsson |
|