ITEM |
TITLE |
EDITOR |
|
Q.iptvsa
(former Q.IPTV prot arch)
|
Signalling and control plane architecture for IPTV
Q.1/11
|
Ghassem
Koleyni
Email: ghassem[at]rogers.com
|
|
CRBT-CRT
|
Signalling Flows for CRBT and CRT services
Q.2/11
|
Jinkyung
Hwang
Email: jkhwang[at]kt.co.kr
|
|
|
|
Jong-Hwa
Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr
|
|
Q.CRBT
(Supplement)
|
Signalling requirements and protocol profile for NGN Customized
multimedia Ring Back Tone (CRBT)
Q.2/11
|
Jinkyung
Hwang
Email: jkhwang[at]kt.co.kr
|
|
|
|
Jong-Hwa
Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr
|
|
Q.CRT
|
Signalling requirements and protocol profile for NGN Customized
multimedia Ring Tone (CBT) service
Q.2/11
|
Jinkyung
Hwang
Email: jkhwang[at]kt.co.kr
|
|
|
|
Jong-Hwa
Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr
|
|
Q.CDIV
(Assumption of draft)
|
NGN
Signalling control protocol communication
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.centrexSig
|
Signalling Requirements and Protocol Profile for IP Centrex services
Q.3/11
|
Tong
Wu
Email: wutong[at]chinatelecom.com.cn
|
|
Q.CONF
(Assumption of draft)
|
NGN
Signalling control protocol Multimedia conference service
Q.3/11
|
Yi
Gao
Email: gao.yi[at]zte.com.cn
|
|
Q.ECT
(Assumption of draft)
|
Explicit Communication
Q.3/11
|
Yiwen
Liu
Email: liu.yiwen[at]zte.com.cn
|
|
Q.hold
|
NGN
Signalling Control Protocol: Communication Hold service
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.OIP/OIR
(Assumption of draft)
|
NGN
Signalling control protocol originating identification
presentation/restriction service
Q.3/11
|
Chris
Hogg
Email:
chogg[at]nortel.com
|
|
Q.TIP/TIR
(Assumption of draft)
|
NGN
Signalling control protocol terminating identification
presentation/restriction service
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.3306.1
|
Q.3306.1 (Protocol at the interface between intra-domain Policy Decision
Physical Entities (PD-PEs) (Rd interface) version 1
Q.5/11
|
Janusz
Pieczerak
Email: Janusz.Pieczerak[at]telekomunikacja.pl
|
|
Q.3307.1
|
Q.3307.1 (Protocol at the interface between inter-domain Policy Decision
Physical Entities (PD-PEs) (Ri interface) version 1
Q.5/11
|
Mingchuan
Yang
Email: yangmch[at]ctbri.com.cn
|
|
|
|
Hayashi
Michiaki
(Co-Editor)
Email: mc-hayashi[at]kddi.com
|
|
Q.3308.1
|
Q.3308.1 (Protocol at the interface between Resource Admission Control
Physical Entities (RAC-PE) and Customer Premise Physical Entity (CP-PE)
(Rh interface) version 1
Q.5/11
|
Yangjung
Kim
Email: zeroplus[at]hufs.ac.kr
|
|
Q.3321.1
|
Protocol at the interface between Service Control Physical Entity
(SC-PE) and Resource and Admission Control Physical Entity (RAC-PE) (Rs
interface) version 2
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.3322.1
|
Resource control protocol no.2 (rcp2) - Protocol at the interface
between Transport Resource Control Physical Entities (TRC-PEs) (Rp
interface) version 2
Q.5/11
|
Mingchuan
Yang
Email: yangmch[at]ctbri.com.cn
|
|
Q.3323.1
|
Q.3303.1 (Resource control protocol no.3 (rcp3) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Policy
Enforcement Physical Entity (PE-PE) (Rw interface) COPS Profile Version
1
Q.5/11
|
Hexian
Huang
Email: huanghexian[at]mail.ritt.com.cn
|
|
Q.3323.2
|
Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Policy
Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative
version 2
Q.5/11
|
Osamu
Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp
|
|
Q.3323.3
|
Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Policy
Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative
version 2
Q.5/11
|
Hexian
Huang
Email: huanghexian[at]mail.ritt.com.cn
|
|
Q.3324.1
|
Q.3304.1 (Resource control protocol no.4 (rc43) - Protocol at the
interface between Transport Resource Control Physical Entity (TRC-PE)
and Transport Physical Entity (T-PE) (Rc interface) Annex A: COPS
Alternative version 2
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.3324.2
|
Q.3304.2 (Resource control protocol no.4 (rcp4) - Protocol at the
interface between Transport Resource Control Physical Entity (TRC-PE)
and Transport Physical Entity (T-PE) (Rc interface) Annex B: SNMP
Alternative version 2
Q.5/11
|
Osamu
Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp
|
|
Q.3325.2
|
Q.3325.1 (Resource control protocol no.5 (rcp5) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Transport
Resource Control Physical Entity (TRC-PE) (Rt interface) in access
network)
Q.5/11
|
Dina
Elabed
Email: dina.elabed[at]orange-ftgroup.com
|
|
Q.ANCP
|
Use of
the Access Node Control Protocol on the Rp Interface
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.FlowStateSig
|
Resource control protocol for Flow State Aware Access QoS Control in an
NGN
Q.5/11
|
John
Adams
Email: john.l.adams[at]bt.com
|
|
Q.PCN App
|
Enhancement of resource admission control to use pre-congestion
notification (PCN)
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.QCP
|
QoS
Coordination Protocol
Q.5/11
|
Gabrielle
Corliano
Email:
gabrielle.2.corliano[at]bt.com
|
|
|
|
Cathy
Zhou
(Co-Editor)
Email: cathy.zhou[at]huawei.com
|
|
Handbook
|
Handbook on deployment of packet-based networks
Q.6/11
|
Keith
Mainwaring
Email: kmainwar[at]cisco.com
|
|
Q.nacp.Ru
|
Protocol for interface for outside NACF
Q.7/11
|
Jae-young
Ahn
Email: ahnjy[at]etri.re.kr
|
|
Q.NGN-nacf-mob0
|
Access
Mobility Control in Network Attachment
Q.7/11
|
Jianyong
Chen
Email: chen.jianyong[at]zte.com.cn
|
|
Q.NGN-nacf-mob1
|
Access
Mobility Control in Network Attachment
Q.7/11
|
Jianyong
Chen
Email: chen.jianyong[at]zte.com.cn
|
|
Q.NGN-nacf-mob2
|
Access
Mobility Control in Network Attachment
Q.7/11
|
Jianyong
Chen
Email: chen.jianyong[at]zte.com.cn
|
|
Q.NRFID-att.sig
|
Signalling requirements and protocol for Networked RFID system
Q.7/11
|
Jae-young
Ahn
Email: ahnjy[at]etri.re.kr
|
|
Q.1912.5 B
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
1: Protocol Implementation Conformance Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.1912.5 C
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
2: Test Suite Structure and Test Purposes (TSS&TP) for Profile A and B
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.1912.5 D
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
3: Test Suite Structure and Test Purposes (TSS&TP) for Profile C
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.1912.5 E
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
4: "Abstract Test Suite (ATS) and partial Protocol Implementation eXtra
Information for Testing (PIXIT) for Profile A and B"
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.3904
|
The
scenarios, list and types of tests for TM local and NUT testing for IMS
on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3905
|
The
scenarios, list and types of tests for TM local and NUT testing for
IP-TV on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3906
|
The
scenarios, list and types of tests for TM local and NUT testing for
Wireless Broadband on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3907
|
The
scenarios, list and types of tests for TM local and NUT testing for NACF
on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3908
|
The
scenarios, list and types of tests for TM local and NUT testing for RACF
on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email:
dtarasov[at]zniis.ru
|
|
Q.3909
|
Handbook on NGN technical means testing as applied to public
telecommunication networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3910
|
Monitoring parameters set for NGN protocols
Q.8/11
|
Shaomin
Wang
Email: wangshm[at]sttri.com.cn
|
|
Q.3911
|
Monitoring parameters set for voice services in NGN
Q.8/11
|
Shaomin
Wang
Email: wangshm[at]sttri.com.cn
|
|
Q.3912
|
Monitoring parameters set for streaming services in NGN
Q.8/11
|
Shaomin
Wang
Email: wangshm[at]sttri.com.cn
|
|
Q.3913
|
Monitoring parameters set for Service level agreement (SLA) in NGN
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3914
|
Monitoring parameters set for wireless broadband network
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3915
|
Monitoring parameters set for wireless broadband network
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3916
|
Testing
scenarios, list and types of tests for NGN (TS1) basic call and
supplementary services
Q.8/11
|
Denis
Andreev
Email: denis.andreev[at]ties.itu.int
|
|
Q.3917
|
Testing
scenarios, list and types of tests for streaming services (TS1)
Q.8/11
|
Denis
Andreev
Email: denis.andreev[at]ties.itu.int
|
|
Q.3918
|
Testing
scenarios, list and types of tests for multimedia services (TS1)
Q.8/11
|
Denis
Andreev
Email: denis.andreev[at]ties.itu.int
|
|
Q.3919
|
The
types of trafffic flows which should be generated for voice, data and
video
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3920
|
Types
and lists of tests for QoS testing on Model networks for
traffic-unloaded conditions
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3921
|
Types
and lists of tests for QoS testing on Model networks for traffic-loaded
conditions
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3922
|
The
scenarios of QoS testing for intra-domain connectivity
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3923
|
The
scenarios of QoS testing for inter-domain connectivity
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3924
|
Scenarios, types and lists of tests for SLA QoS parameters testing
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.
Conf-hold-B
|
Communication HOLD (CH) - Part 1: Protocol Implementation Conformance
Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.
Conf-hold-C
|
Communication HOLD (CH) - Part 2: Test Suite Structure and Test Purposes
(TSS&TP)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q. Conf-OIP-OIR
B
|
Originating Identification Presentation (OIP) and Originating
Identification Restriction (OIR) - Part 1: Protocol Implementation
Conformance Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q. Conf-OIP-OIR
C
|
Originating Identification Presentation (OIP) and Originating
Identification Restriction (OIR) - Part 2: Test Suite Structure and Test
Purposes (TSS&TP)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q. Conf-OIP-OIR
D
|
Originating Identification Presentation (OIP) and Originating
Identification Restriction (OIR) - Part 3: ATS &PIXIT
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Bench
IMS-NGN A
|
IMS/NGN
Performance Benchmark Part 1: Core Concepts
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Bench
IMS-NGN B
|
IMS/NGN
Performance Benchmark Part 2: Subsystem Configurations and Benchmarks
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Bench
IMS-NGN C
|
IMS/NGN
Performance Benchmark Part 3: Traffic Sets and Traffic Profiles
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Conf-TIP-TIR B
|
Terminating Identification Presentation (TIP) and Terminating
Identification Restriction (TIR) - Part 1: Protocol Implementation
Conformance Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Conf-TIP-TIR C
|
Terminating Identification Presentation (TIP) and Terminating
Identification Restriction (TIR) - Part 2: Test Suite Structure and Test
Purposes (TSS&TP)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Conf-TIP-TIR D
|
Terminating Identification Presentation (TIP) and Terminating
Identification Restriction (TIR) - Part 4: ATS & PIXIT
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Pro-delay
IMS
|
IMS/NGN
delay probabilities
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.SIP-ISDN-IT
B (integration tests)
|
Network
Integration Testing between SIP and ISDN/PSTN network signalling
protocols
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.SIP-ISDN-IT
C (integration tests)
|
Network
Integration Testing between SIP and ISDN/PSTN network signalling
protocols
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.SIP-ISDN-IT
D (integration tests)
|
Network
Integration Testing between SIP and ISDN/PSTN network signalling
protocols
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.iptvsa
(former Q.IPTV prot arch)
|
Signalling and control plane architecture for IPTV
Q.1/11
|
Ghassem
Koleyni
Email: ghassem[at]rogers.com
|
|
CRBT-CRT
|
Signalling Flows for CRBT and CRT services
Q.2/11
|
Jinkyung
Hwang
Email: jkhwang[at]kt.co.kr
|
|
|
|
Jong-Hwa
Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr
|
|
Q.CRBT
(Supplement)
|
Signalling requirements and protocol profile for NGN Customized
multimedia Ring Back Tone (CRBT)
Q.2/11
|
Jinkyung
Hwang
Email: jkhwang[at]kt.co.kr
|
|
|
|
Jong-Hwa
Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr
|
|
Q.CRT
|
Signalling requirements and protocol profile for NGN Customized
multimedia Ring Tone (CBT) service
Q.2/11
|
Jinkyung
Hwang
Email: jkhwang[at]kt.co.kr
|
|
|
|
Jong-Hwa
Yi
(Co-Editor)
Email: jhyiee[at]etri.re.kr
|
|
Q.CDIV
(Assumption of draft)
|
NGN
Signalling control protocol communication
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.centrexSig
|
Signalling Requirements and Protocol Profile for IP Centrex services
Q.3/11
|
Tong
Wu
Email: wutong[at]chinatelecom.com.cn
|
|
Q.CONF
(Assumption of draft)
|
NGN
Signalling control protocol Multimedia conference service
Q.3/11
|
Yi
Gao
Email: gao.yi[at]zte.com.cn
|
|
Q.ECT
(Assumption of draft)
|
Explicit Communication
Q.3/11
|
Yiwen
Liu
Email: liu.yiwen[at]zte.com.cn
|
|
Q.hold
|
NGN
Signalling Control Protocol: Communication Hold service
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.OIP/OIR
(Assumption of draft)
|
NGN
Signalling control protocol originating identification
presentation/restriction service
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.TIP/TIR
(Assumption of draft)
|
NGN
Signalling control protocol terminating identification
presentation/restriction service
Q.3/11
|
Chris
Hogg
Email: chogg[at]nortel.com
|
|
Q.3306.1
|
Q.3306.1 (Protocol at the interface between intra-domain Policy Decision
Physical Entities (PD-PEs) (Rd interface) version 1
Q.5/11
|
Janusz
Pieczerak
Email: Janusz.Pieczerak[at]telekomunikacja.pl
|
|
Q.3307.1
|
Q.3307.1 (Protocol at the interface between inter-domain Policy Decision
Physical Entities (PD-PEs) (Ri interface) version 1
Q.5/11
|
Mingchuan
Yang
Email: yangmch[at]ctbri.com.cn
|
|
|
|
Hayashi
Michiaki
(Co-Editor)
Email: mc-hayashi[at]kddi.com
|
|
Q.3308.1
|
Q.3308.1 (Protocol at the interface between Resource Admission Control
Physical Entities (RAC-PE) and Customer Premise Physical Entity (CP-PE)
(Rh interface) version 1
Q.5/11
|
Yangjung
Kim
Email: zeroplus[at]hufs.ac.kr
|
|
Q.3321.1
|
Protocol at the interface between Service Control Physical Entity
(SC-PE) and Resource and Admission Control Physical Entity (RAC-PE) (Rs
interface) version 2
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.3322.1
|
Resource control protocol no.2 (rcp2) - Protocol at the interface
between Transport Resource Control Physical Entities (TRC-PEs) (Rp
interface) version 2
Q.5/11
|
Mingchuan
Yang
Email: yangmch[at]ctbri.com.cn
|
|
Q.3323.1
|
Q.3303.1 (Resource control protocol no.3 (rcp3) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Policy
Enforcement Physical Entity (PE-PE) (Rw interface) COPS Profile Version
1
Q.5/11
|
Hexian
Huang
Email: huanghexian[at]mail.ritt.com.cn
|
|
Q.3323.2
|
Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Policy
Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative
version 2
Q.5/11
|
Osamu
Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp
|
|
Q.3323.3
|
Q.3303.2 (Resource control protocol no.3 (rcp3) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Policy
Enforcement Physical Entity (PE-PE) (Rw interface) H.248 Alternative
version 2
Q.5/11
|
Hexian
Huang
Email: huanghexian[at]mail.ritt.com.cn
|
|
Q.3324.1
|
Q.3304.1 (Resource control protocol no.4 (rc43) - Protocol at the
interface between Transport Resource Control Physical Entity (TRC-PE)
and Transport Physical Entity (T-PE) (Rc interface) Annex A: COPS
Alternative version 2
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.3324.2
|
Q.3304.2 (Resource control protocol no.4 (rcp4) - Protocol at the
interface between Transport Resource Control Physical Entity (TRC-PE)
and Transport Physical Entity (T-PE) (Rc interface) Annex B: SNMP
Alternative version 2
Q.5/11
|
Osamu
Kamatani
Email: kamatani.osamu[at]lab.ntt.co.jp
|
|
Q.3325.2
|
Q.3325.1 (Resource control protocol no.5 (rcp5) - Protocol at the
interface between Policy Decision Physical Entity (PD-PE) and Transport
Resource Control Physical Entity (TRC-PE) (Rt interface) in access
network)
Q.5/11
|
Dina
Elabed
Email: dina.elabed[at]orange-ftgroup.com
|
|
Q.ANCP
|
Use of
the Access Node Control Protocol on the Rp Interface
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.FlowStateSig
|
Resource control protocol for Flow State Aware Access QoS Control in an
NGN
Q.5/11
|
John
Adams
Email: john.l.adams[at]bt.com
|
|
Q.PCN App
|
Enhancement of resource admission control to use pre-congestion
notification (PCN)
Q.5/11
|
Tom
Taylor
Email: tom.taylor[at]rogers.com
|
|
Q.QCP
|
QoS
Coordination Protocol
Q.5/11
|
Gabrielle
Corliano
Email: gabrielle.2.corliano[at]bt.com
|
|
|
|
Cathy
Zhou
(Co-Editor)
Email: cathy.zhou[at]huawei.com
|
|
Handbook
|
Handbook on deployment of packet-based networks
Q.6/11
|
Keith
Mainwaring
Email:
kmainwar[at]cisco.com
|
|
Q.nacp.Ru
|
Protocol for interface for outside NACF
Q.7/11
|
Jae-young
Ahn
Email: ahnjy[at]etri.re.kr
|
|
Q.NGN-nacf-mob0
|
Access
Mobility Control in Network Attachment
Q.7/11
|
Jianyong
Chen
Email: chen.jianyong[at]zte.com.cn
|
|
Q.NGN-nacf-mob1
|
Access
Mobility Control in Network Attachment
Q.7/11
|
Jianyong
Chen
Email: chen.jianyong[at]zte.com.cn
|
|
Q.NGN-nacf-mob2
|
Access
Mobility Control in Network Attachment
Q.7/11
|
Jianyong
Chen
Email: chen.jianyong[at]zte.com.cn
|
|
Q.NRFID-att.sig
|
Signalling requirements and protocol for Networked RFID system
Q.7/11
|
Jae-young
Ahn
Email: ahnjy[at]etri.re.kr
|
|
Q.1912.5 B
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
1: Protocol Implementation Conformance Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.1912.5 C
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
2: Test Suite Structure and Test Purposes (TSS&TP) for Profile A and B
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.1912.5 D
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
3: Test Suite Structure and Test Purposes (TSS&TP) for Profile C
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.1912.5 E
|
Interworking between Session Initiation Protocol (SIP) and Bearer
Independent Call Control Protocol (BICC) or ISDN User Part (ISUP); Part
4: "Abstract Test Suite (ATS) and partial Protocol Implementation eXtra
Information for Testing (PIXIT) for Profile A and B"
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.3904
|
The
scenarios, list and types of tests for TM local and NUT testing for IMS
on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3905
|
The
scenarios, list and types of tests for TM local and NUT testing for
IP-TV on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3906
|
The
scenarios, list and types of tests for TM local and NUT testing for
Wireless Broadband on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3907
|
The
scenarios, list and types of tests for TM local and NUT testing for NACF
on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3908
|
The
scenarios, list and types of tests for TM local and NUT testing for RACF
on the Model networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3909
|
Handbook on NGN technical means testing as applied to public
telecommunication networks
Q.8/11
|
Dmitri
Tarasov
Email: dtarasov[at]zniis.ru
|
|
Q.3910
|
Monitoring parameters set for NGN protocols
Q.8/11
|
Shaomin
Wang
Email: wangshm[at]sttri.com.cn
|
|
Q.3911
|
Monitoring parameters set for voice services in NGN
Q.8/11
|
Shaomin
Wang
Email: wangshm[at]sttri.com.cn
|
|
Q.3912
|
Monitoring parameters set for streaming services in NGN
Q.8/11
|
Shaomin
Wang
Email: wangshm[at]sttri.com.cn
|
|
Q.3913
|
Monitoring parameters set for Service level agreement (SLA) in NGN
Q.8/11
|
Andrey
Koucheriavy
Email:
kouch[at]komset.ru
|
|
Q.3914
|
Monitoring parameters set for wireless broadband network
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3915
|
Monitoring parameters set for wireless broadband network
Q.8/11
|
Andrey
Koucheriavy
Email:
kouch[at]komset.ru
|
|
Q.3916
|
Testing scenarios, list and types of tests for NGN (TS1) basic call and
supplementary services
Q.8/11
|
Denis
Andreev
Email: denis.andreev[at]ties.itu.int
|
|
Q.3917
|
Testing scenarios, list and types of tests for streaming services (TS1)
Q.8/11
|
Denis
Andreev
Email: denis.andreev[at]ties.itu.int
|
|
Q.3918
|
Testing scenarios, list and types of tests for multimedia services (TS1)
Q.8/11
|
Denis
Andreev
Email: denis.andreev[at]ties.itu.int
|
|
Q.3919
|
The
types of trafffic flows which should be generated for voice, data and
video
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3920
|
Types
and lists of tests for QoS testing on Model networks for
traffic-unloaded conditions
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3921
|
Types
and lists of tests for QoS testing on Model networks for traffic-loaded
conditions
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3922
|
The
scenarios of QoS testing for intra-domain connectivity
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3923
|
The
scenarios of QoS testing for inter-domain connectivity
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.3924
|
Scenarios, types and lists of tests for SLA QoS parameters testing
Q.8/11
|
Andrey
Koucheriavy
Email: kouch[at]komset.ru
|
|
Q.
Conf-hold-B
|
Communication HOLD (CH) - Part 1: Protocol Implementation Conformance
Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.
Conf-hold-C
|
Communication HOLD (CH) - Part 2: Test Suite Structure and Test Purposes
(TSS&TP)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q. Conf-OIP-OIR
B
|
Originating Identification Presentation (OIP) and Originating
Identification Restriction (OIR) - Part 1: Protocol Implementation
Conformance Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q. Conf-OIP-OIR
C
|
Originating Identification Presentation (OIP) and Originating
Identification Restriction (OIR) - Part 2: Test Suite Structure and Test
Purposes (TSS&TP)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q. Conf-OIP-OIR
D
|
Originating Identification Presentation (OIP) and Originating
Identification Restriction (OIR) - Part 3: ATS &PIXIT
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Bench
IMS-NGN A
|
IMS/NGN
Performance Benchmark Part 1: Core Concepts
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Bench
IMS-NGN B
|
IMS/NGN
Performance Benchmark Part 2: Subsystem Configurations and Benchmarks
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Bench
IMS-NGN C
|
IMS/NGN
Performance Benchmark Part 3: Traffic Sets and Traffic Profiles
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Conf-TIP-TIR B
|
Terminating Identification Presentation (TIP) and Terminating
Identification Restriction (TIR) - Part 1: Protocol Implementation
Conformance Statement (PICS)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Conf-TIP-TIR C
|
Terminating Identification Presentation (TIP) and Terminating
Identification Restriction (TIR) - Part 2: Test Suite Structure and Test
Purposes (TSS&TP)
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Conf-TIP-TIR D
|
Terminating Identification Presentation (TIP) and Terminating
Identification Restriction (TIR) - Part 4: ATS & PIXIT
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.Pro-delay
IMS
|
IMS/NGN
delay probabilities
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.SIP-ISDN-IT
B (integration tests)
|
Network Integration Testing between SIP and ISDN/PSTN network signalling
protocols
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.SIP-ISDN-IT
C (integration tests)
|
Network Integration Testing between SIP and ISDN/PSTN network signalling
protocols
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|
|
Q.SIP-ISDN-IT
D (integration tests)
|
Network Integration Testing between SIP and ISDN/PSTN network signalling
protocols
Q.8/11
|
Martin
Brand
Email: martin.brand[at]telekom.at
|